Pinedale Anticline Project Office Wyoming Dept. of Game and Fish Wyoming Dept. of Environmental Quality Wyoming Dept. of Agriculture Wyoming BLM
Manual | Login
 
Search Locations
 

PADMS Reports

Operator Name Type Dist Acres Recl Acres Last Seeding Seed Mix Last Spatial Last Qualitative Last Frequency Last Intercept Last Photo Status
Buffalo BLM Ref. Point Reference Point                    
Buffalo Mesa 3-19 Well Pad 9.61   08/01/2009 Sagebrush-dominated w/ Sandy Soils 06/02/2011 08/28/2017       Reclamation Not Initiated
Buffalo Mesa 3-19 Road Road 1.41       08/01/2011         Reclamation Not Initiated
Buffalo Mesa 8-10 Well Pad 6.46       06/02/2011         Reclamation Not Initiated
Buffalo Mesa 8-10 Road Road 11.32       08/02/2011         Reclamation Not Initiated
Buffalo Two Buttes 16-15 Well Pad 4.74       09/20/2011         Reclamation Not Initiated
Buffalo Two Buttes 16-15 Road Road 2.00       09/20/2011         Reclamation Not Initiated
Jonah Energy Antelope 15-23 Well Pad 4.61 3.89 11/17/2014 Other 06/09/2014 06/11/2021   06/30/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_15-23_ref Reference Point               06/30/2017 06/30/2017  
Jonah Energy Antelope_15-23_Road Road 3.76       06/09/2014         Reclamation Not Initiated
Jonah Energy Antelope 15-4 Well Pad 3.90 2.60 11/12/2014 Other 06/04/2014 06/11/2021   06/28/2017 06/25/2018 Reclamation Not Initiated
Jonah Energy Antelope_15-4_ref Reference Point               06/28/2017 06/28/2017  
Jonah Energy Antelope 16-5 Well Pad 5.89 4.37 11/19/2014 Other 06/04/2014 06/11/2021   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_16-5_ref Reference Point               06/28/2017 06/28/2017  
Jonah Energy Antelope 16-5 Road Road 1.48       06/04/2014         Reclamation Not Initiated
Jonah Energy ANTELOPE 3-14 Well Pad 7.29 7.29 09/14/2013 Sagebrush-dominated w/ Sandy Soils 06/09/2014 06/11/2021   06/30/2017 06/25/2018 Reclamation Not Initiated
Jonah Energy ANTELOPE 3-14_ref Reference Point               06/30/2017 06/30/2017  
Jonah Energy Antelope 3-5 Well Pad 8.08 3.57 09/14/2005 Sagebrush-dominated w/ Sandy Soils 06/03/2014 06/10/2021   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_3-5_ref Reference Point               06/29/2017 06/29/2017  
Jonah Energy Antelope_3-5_roads Road 0.28       06/03/2014         Reclamation Not Initiated
Jonah Energy Antelope 3-9 Well Pad 4.41 3.22 11/12/2014 Other 06/04/2014 06/11/2021   06/28/2017 06/25/2018 Reclamation Not Initiated
Jonah Energy Antelope 3-9_road Road 0.07       06/04/2014         Reclamation Not Initiated
Jonah Energy Antelope 4-15 Well Pad 7.95 7.95 11/10/2010 Sagebrush-dominated w/ Sandy Soils 06/04/2014 07/30/2019   06/14/2016 06/25/2018 Final Reclamation Achieved
Jonah Energy Antelope_4-15_ref Reference Point               06/14/2016    
Jonah Energy Antelope 4-4 Well Pad 5.02 3.66 11/17/2014 Other 06/04/2014 06/10/2021   06/30/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_4-4_ref Reference Point               06/30/2017 06/30/2017  
Jonah Energy Antelope 4-4 Road Road 0.70       06/04/2014         Reclamation Not Initiated
Jonah Energy Antelope 4-5 Well Pad 6.00 4.50 11/12/2014 Other 06/03/2014 06/10/2021   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_4-5_ref Reference Point               06/29/2017 06/29/2017  
Jonah Energy Antelope_4-5_Road Road 1.72       06/03/2014         Reclamation Not Initiated
Jonah Energy Antelope 5-4 Well Pad 6.31 5.08 11/17/2014 Other 06/04/2014 06/10/2021   06/30/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_5-4_ref Reference Point               06/30/2017 06/30/2017  
Jonah Energy Antelope_5-4_Roads Road 0.16       06/04/2014         Reclamation Not Initiated
Jonah Energy Antelope 5-5 Well Pad 5.74 4.74 11/13/2014 Other 06/03/2014 06/10/2021   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_5-5_ref Reference Point               06/29/2017 06/29/2017  
Jonah Energy Antelope_5-5_Roads Road 0.68       06/03/2014         Reclamation Not Initiated
Jonah Energy Antelope 6-4 Well Pad 5.93 3.72 07/20/2013 Sagebrush-dominated w/ Sandy Soils 06/04/2014 06/10/2021   06/30/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_6-4_ref Reference Point               06/30/2017 06/30/2017  
Jonah Energy Antelope_6-4_Roads Road 0.84       06/04/2014         Reclamation Not Initiated
Jonah Energy Antelope 9-5 Well Pad 6.17 4.58 11/17/2014 Other 06/04/2014 06/11/2021   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_9-5_ref Reference Point               06/29/2017 06/29/2017  
Jonah Energy Antelope 9-5 Road Road 1.43       06/04/2014         Reclamation Not Initiated
Jonah Energy Newfield Laydown Yard Other 8.32 1.84 01/01/1990 Other 07/21/2013 06/11/2021   06/30/2017 06/25/2018 Reclamation Not Initiated
Jonah Energy Newfield Laydown Yard_ref Reference Point               06/30/2017 06/30/2017  
Jonah Energy Newfield_Laydown_Yard_Road Road 0.14       07/21/2013         Reclamation Not Initiated
Jonah Energy NFX WDW #1 Well Pad 5.72 1.66 05/08/2010 Sagebrush-dominated w/ Sandy Soils 06/09/2014 06/11/2021   06/30/2017 06/25/2018 Reclamation Not Initiated
Jonah Energy NFX WDW #1_ref Reference Point               06/30/2017 06/30/2017  
Jonah Energy NFX WDW #1 Road Road 0.18       06/09/2014         Reclamation Not Initiated
Jonah Energy RAINBOW 10-30D Well Pad 6.95 5.55 09/26/2011 Sagebrush-dominated w/ Sandy Soils 06/03/2014 06/10/2021   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy RAINBOW 10-30D_ref Reference Point               06/28/2017 06/28/2017  
Jonah Energy RAINBOW 10-30D Road Road 2.09       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 10-32 Well Pad 6.41 5.13 11/19/2014 Other 06/03/2014 06/10/2021   06/30/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow_10-32_ref Reference Point               06/30/2017 06/30/2017  
Jonah Energy Rainbow 10-32 Road Road 2.08       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 15-31 PAD Well Pad 9.18 3.85 09/25/2011 Sagebrush-dominated w/ Sandy Soils 06/03/2014 06/10/2021   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow_15-31_PAD_ref Reference Point               06/29/2017 06/29/2017  
Jonah Energy Rainbow_15-31 PAD_Road Road 0.19       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 15-32 Well Pad 5.50 4.34 11/19/2014 Other 06/03/2014 06/10/2021   06/30/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow_15-32_ref Reference Point               06/30/2017 06/30/2017  
Jonah Energy Rainbow 15-32 Road Road 0.33       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 16-31 Well Pad 4.45 3.30 11/17/2014 Other 06/03/2014 06/10/2021   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow_16-31_ref Reference Point               06/29/2017 06/29/2017  
Jonah Energy Rainbow_16-31_Road Road 0.21       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 3-31 Well Pad 5.63 3.77 11/20/2014 Other 06/03/2014 06/10/2021   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow_3-31_ref Reference Point               06/28/2017 06/28/2017  
Jonah Energy Rainbow 3-31 Road Road 0.58       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 5-31 Well Pad 6.42 5.19 11/17/2014 Other 06/03/2014 06/10/2021   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow_5-31_ref Reference Point               06/28/2017 06/28/2017  
Jonah Energy Rainbow_5-31_Road Road 0.20       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 5-32 Well Pad 6.09 5.05 11/15/2014 Other 06/03/2014 06/10/2021   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow_5-32_ref Reference Point               06/28/2017 06/28/2017  
Jonah Energy Rainbow 5-32 Road Road 0.20       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 6-32 Well Pad 6.00 4.25 11/20/2014 Other 06/03/2014 06/10/2021   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow 6-32 Road Road 1.38       06/03/2014         Reclamation Not Initiated
Jonah Energy RAINBOW 9-30D Well Pad 9.83 7.81 11/14/2014 Other 06/03/2014 06/10/2021   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy RAINBOW 9-30D Road Road 0.46       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 9-31 Well Pad 7.89 5.94 11/15/2014 Other 06/03/2014 06/10/2021   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow_9-31_ref Reference Point               06/29/2017 06/29/2017  
Jonah Energy Rainbow_9-31_Road Road 0.84       06/03/2014         Reclamation Not Initiated
Mustang Highway Federal 2 Well Pad 2.29 2.29 10/20/2010 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/15/2011       Interim Reclamation Full Development
Mustang Highway Federal 2 Road Road 5.69   10/20/2010 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/15/2011       Interim Reclamation Initiated
Mustang Highway Federal 4Y - 4Z Well Pad 4.98 3.46 10/30/2007 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/06/2010       Interim Reclamation Full Development
Mustang Highway Federal 5 & 27 Well Pad 9.38   05/20/2010 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/05/2010       Interim Reclamation Initiated
Mustang Highway Federal 5 Road Road 0.99   10/02/2004 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/05/2010       Interim Reclamation Initiated
Mustang Highway Federal 7 Well Pad 6.52 5.02 10/30/2007 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/06/2010       Interim Reclamation Initiated
Mustang Highway Federal 7 Road Road 2.02   10/02/2004 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/16/2010       Interim Reclamation Initiated
Mustang Highway SWD 11 Well Pad 5.48 3.55 10/18/2005 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/05/2010       Interim Reclamation Initiated
Mustang Highway SWD 11 Road Road 2.20   10/18/2005 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/05/2010       Interim Reclamation Initiated
Mustang Southeast Pinedale Federal #1 Well Pad     11/19/2006 Sagebrush-dominated w/ Sandy Soils   07/05/2010       Interim Reclamation Initiated
QEP Energy Company M 11-7 Well Pad 15.24       11/14/2012         Reclamation Not Initiated
QEP Energy Company M 11-7 Well Pad 17.20 13.92     06/15/2015         Reclamation Not Initiated
QEP Energy Company M 11-7 Road Road 17.25       08/04/2015         Reclamation Not Initiated
QEP Energy Company M 3-8 Well Pad 6.71 4.76     08/05/2015         Reclamation Not Initiated
QEP Energy Company M 3-8 Well Pad 6.71 5.39     07/13/2009         Interim Reclamation Initiated
QEP Energy Company M 4-8 Well Pad 4.01 2.66     08/12/2009         Interim Reclamation Initiated
QEP Energy Company M 6-7 Well Pad 15.52   11/07/2010 Other 08/04/2015 07/13/2011       Interim Reclamation Initiated
QEP Energy Company SP 6-32 Well Pad 8.42 6.39 11/07/2009 Other 08/05/2010 07/03/2013   07/12/2012 07/02/2013 Interim Reclamation Initiated
QEP Energy Company SP 8-32 Well Pad 17.52 12.24 11/07/2007 Other 10/27/2011 07/21/2012       Interim Reclamation Initiated
SWEPI LP Rainbow 7-31 Well Pad 4.99 3.74 10/06/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 07/14/2015   06/13/2013 08/14/2015 Interim Reclamation Initiated
UAE AN 11-10BP Pipeline                   Reclamation Not Initiated
UAE AN 14-4BP Pipeline 0.76 0.76 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/20/2018 07/04/2022     07/04/2022 Final Reclamation Initiated
UAE AN 14-4P Pipeline 0.81 0.81 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022     07/04/2022 Final Reclamation Initiated
UAE AN 15-4P Pipeline 3.08 3.08 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022   06/28/2018 07/04/2022 Final Reclamation Initiated
UAE AN 2-5BP Pipeline 0.52 0.52 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022   06/28/2018 07/04/2022 Final Reclamation Initiated
UAE AN 2-5P Pipeline 3.00 3.00 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022   06/28/2018 07/04/2022 Final Reclamation Initiated
UAE AN 2-9P Pipeline 2.31 2.31 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022   07/02/2018 07/04/2022 Final Reclamation Initiated
UAE AN 3-9P Pipeline 2.45 2.45 10/13/2018 Sagebrush-dominated w/ Sandy Soils 03/20/2018 07/04/2022     07/04/2022 Final Reclamation Initiated
UAE AN 5-4P Pipeline 3.05 3.05 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022   06/28/2018 07/04/2022 Final Reclamation Initiated
UAE AN 6-4BP Pipeline 3.10 3.10 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022   06/28/2018 08/04/2022 Final Reclamation Initiated
UAE AN 6-4P Pipeline 1.52 1.52 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/29/2018 07/04/2022 Final Reclamation Initiated
UAE Boulder 10-25 Pipeline Pipeline 1.15       08/24/2011         Reclamation Not Initiated
UAE Boulder 10-32 Pipeline Pipeline 1.46       08/12/2011         Reclamation Not Initiated
UAE Boulder 14-31 Pipeline Pipeline 1.06       08/19/2011         Reclamation Not Initiated
UAE Boulder 14-34 Pipeline Pipeline 1.47       08/11/2011         Reclamation Not Initiated
UAE Boulder 5-30 Pipeline Pipeline 1.22       08/24/2011         Reclamation Not Initiated
UAE Boulder 6-32 Pipeline Pipeline 2.62       08/11/2011         Reclamation Not Initiated
UAE BR 10-25P Pipeline 1.04 1.04 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/30/2022   06/23/2020 06/29/2022 Final Reclamation Initiated
UAE BR 10-29P Pipeline 22.43 22.43 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/23/2020 06/30/2022 Final Reclamation Initiated
UAE BR 10-31P Pipeline 1.58 1.58 09/12/2016 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/24/2020 06/30/2022 Final Reclamation Initiated
UAE BR 10-34P Pipeline 2.00 2.00 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/04/2022   06/25/2020 08/04/2022 Final Reclamation Initiated
UAE BR 11-18P Pipeline 0.95 0.95 10/13/2016 Sagebrush-dominated w/ Sandy Soils 06/29/2017 06/30/2022   06/25/2020 06/30/2022 Final Reclamation Initiated
UAE BR 11-19P Pipeline 2.65 2.65 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/04/2015 07/01/2022   06/24/2020 08/01/2022 Final Reclamation Initiated
UAE BR 11-33BP Pipeline 0.48 0.48 09/12/2008 Sagebrush-dominated w/ Sandy Soils 07/17/2018 06/30/2022   06/24/2020 06/30/2022 Final Reclamation Initiated
UAE BR 11-33P Pipeline 2.45 2.45 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/24/2020 08/04/2022 Final Reclamation Initiated
UAE BR 11-34P Pipeline 0.68 0.68 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/05/2022   06/25/2020 07/04/2022 Final Reclamation Initiated
UAE BR 12-19BP Pipeline 0.35 0.35 10/15/2017 Sagebrush-dominated w/ Sandy Soils 03/18/2018 07/01/2022   06/24/2020 06/30/2022 Final Reclamation Initiated
UAE BR 12-19CP Pipeline 0.29 0.29 10/15/2017 Sagebrush-dominated w/ Sandy Soils 03/18/2018 07/05/2022   06/23/2020 07/05/2022 Final Reclamation Initiated
UAE BR 12-19P Pipeline 4.09 4.09 09/12/2008 Sagebrush-dominated w/ Sandy Soils 04/10/2017 06/30/2022   06/24/2020 06/30/2022 Final Reclamation Initiated
UAE BR 1-32P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/09/2014       Final Reclamation Initiated
UAE BR 14-31P Pipeline 1.57 1.57 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/25/2020 08/04/2022 Final Reclamation Initiated
UAE BR 14-32P Pipeline 4.95 4.95 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/24/2020 06/30/2022 Final Reclamation Initiated
UAE BR 14-33P Pipeline 3.20 3.20 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/24/2020 06/30/2022 Final Reclamation Initiated
UAE BR 14-34P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/19/2014       Final Reclamation Initiated
UAE BR 15-31P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/20/2014       Final Reclamation Initiated
UAE BR 16-19P Pipeline 22.21 22.21 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/23/2020 07/05/2022 Final Reclamation Initiated
UAE BR 2-32P Pipeline 22.40 22.40 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/25/2020 06/30/2022 Final Reclamation Initiated
UAE BR 3-18P Pipeline 0.26 0.26 10/13/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 06/28/2022   06/18/2020 08/01/2022 Final Reclamation Initiated
UAE BR 3-33P Pipeline 1.08 1.08 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/25/2020 06/30/2022 Final Reclamation Initiated
UAE BR 4-18BP Pipeline 3.22 3.22 10/15/2017 Sagebrush-dominated w/ Sandy Soils 03/18/2018 07/05/2022   06/22/2020 06/29/2022 Final Reclamation Initiated
UAE BR 4-18P Pipeline 3.51 3.51 10/13/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 06/29/2022   06/22/2020 06/29/2022 Final Reclamation Initiated
UAE BR 4-19P Pipeline 10.02 10.02 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/29/2017 06/30/2022   06/25/2020 06/30/2022 Final Reclamation Initiated
UAE BR 4-29P Pipeline 2.33 2.33 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/29/2017 06/30/2022   06/23/2020 06/30/2022 Final Reclamation Initiated
UAE BR 4-33P Pipeline 2.84 2.84 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/25/2020 08/04/2022 Final Reclamation Initiated
UAE BR 5-19P Pipeline 1.01 1.01 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/07/2019 06/30/2022   06/25/2020 08/04/2022 Final Reclamation Initiated
UAE BR 5-20P Pipeline 1.54 1.54 09/13/2008 Loamy Soil 04/10/2017 06/30/2022   06/23/2020 06/29/2022 Final Reclamation Initiated
UAE BR 5-29P Pipeline 22.36 22.36 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/23/2020 06/30/2022 Final Reclamation Initiated
UAE BR 5-30P Pipeline 3.48 3.48 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/29/2017 06/12/2022   06/24/2020 06/12/2022 Final Reclamation Initiated
UAE BR 6-18P Pipeline 1.17 1.17 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/24/2020 06/30/2022 Final Reclamation Initiated
UAE BR 6-19BP Pipeline 1.15 1.15 10/01/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 06/30/2022   06/24/2020 06/29/2022 Final Reclamation Initiated
UAE BR 6-19P Pipeline 20.98 20.98 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/29/2022   06/24/2020 06/29/2022 Final Reclamation Initiated
UAE BR 6-33P Pipeline 0.70 0.70 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/24/2020 06/30/2022 Final Reclamation Initiated
UAE BR 7-19BP Pipeline 1.39 1.39 10/01/2016 Loamy Soil 04/10/2017 06/29/2022   06/24/2020 08/23/2021 Final Reclamation Initiated
UAE BR 7-19P Pipeline 0.70 0.70 09/13/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/29/2022   06/24/2020 06/29/2022 Final Reclamation Initiated
UAE BR 7-25BP Pipeline 1.64 1.64 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/23/2020 06/29/2022 Final Reclamation Initiated
UAE BR 7-25P Pipeline 5.16 5.16 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/01/2022   06/22/2020 06/29/2022 Final Reclamation Initiated
UAE BR 7-30P Pipeline 2.79 2.79 06/27/2017 Sagebrush-dominated w/ Sandy Soils 04/10/2017 06/29/2022   06/23/2020 06/29/2022 Final Reclamation Initiated
UAE BR 8-25P Pipeline 2.01 2.01 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/30/2022   06/23/2020 08/01/2022 Final Reclamation Initiated
UAE BR 9-32P Pipeline 24.50 24.50 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/01/2022   06/25/2020 08/01/2022 Final Reclamation Initiated
UAE CY 7-9 (UTE) Reference Point               07/03/2018 07/13/2018  
UAE GR 7-9 (UTE) Reference Point               07/03/2018 07/13/2018  
UAE Ly 10-14 (UTE) Reference Point               07/03/2018 07/13/2018  
UAE Ly 7-9 (UTE) Reference Point               07/04/2018 07/04/2018  
UAE M 10-17P Pipeline 5.70 5.70 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/17/2019   06/17/2019 07/27/2020 Final Reclamation Initiated
UAE M 10-21P Pipeline 10.73 10.73 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/13/2019 06/23/2022 Final Reclamation Initiated
UAE M 10-33P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE M 10-34P Pipeline 15.42 15.42 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/28/2022   06/06/2019 06/27/2022 Final Reclamation Initiated
UAE M 10-35P Pipeline 3.96 3.96 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/10/2020 06/23/2022 Final Reclamation Initiated
UAE M 11-18P Pipeline 3.74 3.74 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/10/2021   06/10/2020 06/10/2020 Final Reclamation Initiated
UAE M 11-20P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/22/2014       Final Reclamation Initiated
UAE M 11-26P Pipeline 3.65 3.65 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/27/2022   06/11/2020 06/27/2022 Final Reclamation Initiated
UAE M 11-28P Pipeline 4.68 4.68 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/12/2019 06/23/2022 Final Reclamation Initiated
UAE M 11-33P Pipeline 4.40 4.40 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/11/2019 06/23/2022 Final Reclamation Initiated
UAE M 11-34P Pipeline 1.72 1.72 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   05/26/2020 06/29/2022 Final Reclamation Initiated
UAE M 1-19P Pipeline 6.53 6.53 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2021   06/13/2019 07/28/2020 Final Reclamation Initiated
UAE M 12-21P Pipeline 1.12 1.12 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2021   06/13/2019 07/22/2020 Final Reclamation Initiated
UAE M 12-22P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/23/2014       Final Reclamation Initiated
UAE M 12-27 Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/29/2014       Final Reclamation Initiated
UAE M 12-27P Pipeline 1.32 1.32 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/24/2022   06/10/2019 06/23/2022 Final Reclamation Initiated
UAE M 12-9P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/22/2014       Final Reclamation Initiated
UAE M 13-15P Pipeline 1.81 1.81 07/23/2014 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/27/2021   06/10/2019 07/27/2020 Final Reclamation Initiated
UAE M 13-26P Pipeline 1.96 1.96 10/15/2017 Sagebrush-dominated w/ Sandy Soils 03/18/2018 06/29/2022   06/06/2019 06/29/2022 Final Reclamation Initiated
UAE M 13-27P Pipeline 10.64 10.64 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/30/2022   06/09/2020 06/30/2022 Final Reclamation Initiated
UAE M 1-33 Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/29/2014       Final Reclamation Initiated
UAE M 13-35P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE M 1-35P Pipeline 1.43 1.43 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/30/2022   06/11/2019 06/30/2022 Final Reclamation Initiated
UAE M 14-26P Pipeline 3.07 3.07 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/27/2022   06/06/2019 08/01/2022 Final Reclamation Initiated
UAE M 14-27P Pipeline 3.76 3.76 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/28/2022   06/11/2019 08/01/2022 Final Reclamation Initiated
UAE M 14-34P Pipeline 8.50 8.50 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/27/2022   06/05/2019 06/27/2022 Final Reclamation Initiated
UAE M 14-8BP Pipeline 1.54 1.54 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 06/23/2022   06/18/2019 06/23/2022 Final Reclamation Initiated
UAE M 14-8P Pipeline 8.67 8.67 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/18/2019 06/23/2022 Final Reclamation Initiated
UAE M 15-18P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/22/2014       Final Reclamation Initiated
UAE M 15-19P Pipeline 3.18 3.18 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2021   06/12/2019 07/28/2020 Final Reclamation Initiated
UAE M 15-21P Pipeline 10.83 10.83 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/20/2016 06/23/2022 Final Reclamation Initiated
UAE M 15-22P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/23/2014       Final Reclamation Initiated
UAE M 15-27P Pipeline 0.70 0.70 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/05/2022   06/21/2016 08/04/2022 Final Reclamation Initiated
UAE M 15-35P Pipeline 0.37 0.37 09/12/2008 Sagebrush-dominated w/ Sandy Soils 07/17/2018 07/05/2022   06/10/2020 07/05/2022 Final Reclamation Initiated
UAE M 16-17P Pipeline 7.16 7.16 09/12/2009 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/10/2020 06/23/2022 Final Reclamation Initiated
UAE M 16-18P Pipeline 5.37 5.37 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2021   06/17/2019 07/28/2020 Final Reclamation Initiated
UAE M 16-19P Pipeline 0.85 0.85 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2021   06/12/2019 07/28/2020 Final Reclamation Initiated
UAE M16-19 Pipeline Pipeline 1.03 1.03     10/04/2011         Reclamation Not Initiated
UAE M 16-22P Pipeline 7.44 7.44 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/27/2022   06/11/2020 06/27/2022 Final Reclamation Initiated
UAE M 16-27P Pipeline 7.21 7.21 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/27/2022   06/10/2019 06/27/2022 Final Reclamation Initiated
UAE M 16-33P Pipeline 5.35 5.35 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/24/2022   06/11/2019 06/23/2022 Final Reclamation Initiated
UAE M 1-7P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/22/2014       Final Reclamation Initiated
UAE M 2-17P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/23/2014       Final Reclamation Initiated
UAE M 2-30P Pipeline 1.80 1.80 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2021   06/12/2019 07/28/2020 Final Reclamation Initiated
UAE M 2-7BP Pipeline 3.03 3.03 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 06/30/2022   06/18/2019 06/30/2022 Final Reclamation Initiated
UAE M 2-7P Pipeline 10.18 10.18 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2022   06/18/2019 06/22/2022 Final Reclamation Initiated
UAE M 3-17P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/22/2014       Final Reclamation Initiated
UAE M 3-21P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/23/2014       Final Reclamation Initiated
UAE M 3-34P Pipeline 14.63 14.63 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/09/2020 06/29/2022 Final Reclamation Initiated
UAE M 3-7P Pipeline 1.01 1.01 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/27/2021   06/18/2019 07/27/2020 Final Reclamation Initiated
UAE M 3-8P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/22/2014       Final Reclamation Initiated
UAE M 4-21P Pipeline 5.31 5.31 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/24/2022   06/17/2019 06/23/2022 Final Reclamation Initiated
UAE M 4-26P Pipeline 3.95 3.95 09/12/2009 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/11/2020 06/29/2022 Final Reclamation Initiated
UAE M 4-27P Pipeline 3.83 3.83 10/17/2017 Sagebrush-dominated w/ Sandy Soils 07/30/2019 07/05/2022     08/04/2022 Final Reclamation Initiated
UAE M 4-28P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/23/2014       Final Reclamation Initiated
UAE M 4-35P Pipeline 3.04 3.04 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/06/2019 06/29/2022 Final Reclamation Initiated
UAE M 4-6P Pipeline 6.39 6.39 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/24/2022   06/18/2019 06/22/2022 Final Reclamation Initiated
UAE M 5-17P Pipeline 7.69 7.69 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2021   06/17/2019 07/28/2020 Final Reclamation Initiated
UAE M 5-20P Pipeline 3.56 3.56 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2021   06/12/2019 07/28/2020 Final Reclamation Initiated
UAE M 5-21P Pipeline 0.30 0.30 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2021   06/13/2019 07/22/2020 Final Reclamation Initiated
UAE M 5-22P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/23/2014       Final Reclamation Initiated
UAE M 5-35P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE M 5-8BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/22/2014       Final Reclamation Initiated
UAE M 5-8P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/22/2014       Final Reclamation Initiated
UAE M 5-9P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/22/2014       Final Reclamation Initiated
UAE M 6-17P Pipeline 7.13 7.13 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/27/2021   06/17/2019 07/27/2020 Final Reclamation Initiated
UAE M 6-18P Pipeline 3.63 3.63 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2021   06/17/2019 07/28/2020 Final Reclamation Initiated
UAE M 6-21P Pipeline 10.39 10.39 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/11/2020 06/23/2022 Final Reclamation Initiated
UAE M 6-22P Pipeline 3.26 3.26 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/27/2022   06/11/2020 06/27/2022 Final Reclamation Initiated
UAE M 6-27AP Pipeline 1.08 1.08 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/05/2022   06/10/2019 07/05/2022 Final Reclamation Initiated
UAE M 6-27BP Pipeline 13.04 13.04 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/10/2019 06/29/2022 Final Reclamation Initiated
UAE M 6-28P Pipeline 4.25 4.25 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/11/2019 06/23/2022 Final Reclamation Initiated
UAE M 6-3413 Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/29/2014       Final Reclamation Initiated
UAE M 6-34BP Pipeline 0.62 0.62 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/05/2022   06/05/2019 07/05/2022 Final Reclamation Initiated
UAE M 6-34P Pipeline 10.37 10.37 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/05/2019 07/28/2022 Final Reclamation Initiated
UAE M 6-5P Pipeline 1.51 1.51 10/15/2017 Sagebrush-dominated w/ Sandy Soils 03/20/2018 07/21/2021   06/18/2019 07/21/2020 Final Reclamation Initiated
UAE M 6-6P Pipeline 11.03 11.03 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2022   06/18/2019 06/22/2022 Final Reclamation Initiated
UAE M 6-7P Pipeline 1.07 1.07 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/22/2022   06/18/2019 06/22/2022 Final Reclamation Initiated
UAE M 7-27P Pipeline 0.69 0.69 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/05/2022   06/10/2019 07/05/2022 Final Reclamation Initiated
UAE M 7-34P Pipeline 2.46 2.46 12/15/2012 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/05/2019 06/29/2022 Final Reclamation Initiated
UAE M 7-7BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/22/2014       Final Reclamation Initiated
UAE M 7-7P Pipeline 8.75 8.75 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2022   06/18/2019 06/22/2022 Final Reclamation Initiated
UAE M 8-17P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   08/31/2015     08/31/2015 Final Reclamation Initiated
UAE M 8-17P Pipeline 9.04 9.04 09/12/2008 Sagebrush-dominated w/ Sandy Soils 07/17/2018 06/24/2022   06/17/2019 06/23/2022 Final Reclamation Initiated
UAE M 8-19P Pipeline 3.19 3.19 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2021   06/12/2019 07/28/2020 Final Reclamation Initiated
UAE M 8-28AP Pipeline 6.67 6.67 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/11/2019 06/23/2022 Final Reclamation Initiated
UAE M 8-28BP Pipeline 1.54 1.54 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/11/2019 06/23/2022 Final Reclamation Initiated
UAE M 8-29 Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/29/2014       Final Reclamation Initiated
UAE M 8-29B Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/29/2014       Final Reclamation Initiated
UAE M 8-29BP Pipeline 0.37 0.37 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/24/2022   06/12/2019 06/23/2022 Final Reclamation Initiated
UAE M 8-29P Pipeline 5.32 5.32 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/12/2019 06/23/2022 Final Reclamation Initiated
UAE M 8-32P Pipeline 3.34 3.34 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/30/2022   06/11/2019 07/28/2022 Final Reclamation Initiated
UAE M 8-33P Pipeline 3.76 3.76 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/11/2019 06/29/2022 Final Reclamation Initiated
UAE M 8-7P Pipeline 3.17 3.17 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 06/22/2022   06/18/2019 08/02/2022 Final Reclamation Initiated
UAE M 8-8P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/22/2014       Final Reclamation Initiated
UAE M 9-28 Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/29/2014       Final Reclamation Initiated
UAE M 9-28P Pipeline 10.43 10.43 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/12/2019 06/23/2022 Final Reclamation Initiated
UAE M 9-33P Pipeline 1.15 1.15 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/27/2022   06/11/2020 07/28/2022 Final Reclamation Initiated
UAE M 9-34P Pipeline 20.04 20.04 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/27/2022   06/09/2020 06/27/2022 Final Reclamation Initiated
UAE M 9-7BP Pipeline 3.79 3.79 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 06/23/2022   06/18/2019 06/23/2022 Final Reclamation Initiated
UAE M 9-7P Pipeline 8.66 8.66 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2022   06/18/2019 08/02/2022 Final Reclamation Initiated
UAE Mesa 11-20 Loop Pipeline 1.74       10/04/2011         Reclamation Not Initiated
UAE Mesa 15-18 Pipeline Pipeline 0.07       10/04/2011         Final Reclamation Initiated
UAE Mesa 7-18 Pipeline Pipeline 5.01       10/04/2011         Reclamation Not Initiated
UAE Mesa 8-30 Pipeline Pipeline 7.56 7.56     10/04/2011         Reclamation Not Initiated
UAE NB 16-10P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE New Mesa 16 Inch Pipeline 41.18       06/02/2011         Reclamation Not Initiated
UAE Rainbow 7-31 Pipeline Pipeline 0.29       08/26/2011         Reclamation Not Initiated
UAE RB 10-31P Pipeline 3.05 3.05 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022   06/28/2018 07/04/2022 Final Reclamation Initiated
UAE RB 11-31P Pipeline 1.01 1.01 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022   06/28/2018 07/04/2022 Final Reclamation Initiated
UAE RB 12-30P Pipeline 4.57 4.57 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/21/2018 07/04/2022 Final Reclamation Initiated
UAE RB 13-32P Pipeline 4.18 4.18 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022   06/28/2018 07/04/2022 Final Reclamation Initiated
UAE RB 15-31P Pipeline 3.12 3.12 10/12/2015 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022   06/28/2018 07/04/2022 Final Reclamation Initiated
UAE RB 3-31P Pipeline 3.12 3.12 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/20/2016 07/04/2022   06/26/2018 07/04/2022 Final Reclamation Initiated
UAE RB 3-32P Pipeline 3.15 3.15 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/20/2016 07/04/2022   06/27/2018 07/04/2022 Final Reclamation Initiated
UAE RB 4-31P Pipeline 1.14 1.14 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/26/2018 07/04/2022 Final Reclamation Initiated
UAE RB 5-31P Pipeline 1.63 1.63 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/20/2016 07/04/2022   06/26/2018 07/04/2022 Final Reclamation Initiated
UAE RB 7-31P Pipeline 2.93 2.93 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/20/2016 07/04/2022   06/27/2018 07/04/2022 Final Reclamation Initiated
UAE RB 7-31P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE RB 8-31P Pipeline 0.93 0.93 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/20/2016 07/04/2022   06/26/2018 07/04/2022 Final Reclamation Initiated
UAE RB 9-31P Pipeline 1.33 1.33 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/28/2018 07/04/2022 Final Reclamation Initiated
UAE Riverside 10-23 Pipeline Pipeline 3.86       08/26/2011         Reclamation Not Initiated
UAE RS 10-13BP Pipeline 0.24 0.24 09/13/2008 Sagebrush-dominated w/ Sandy Soils 04/10/2017 06/29/2022   06/18/2020 06/29/2022 Final Reclamation Initiated
UAE RS 10-13P Pipeline 15.95 15.95 06/16/2020 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/27/2022   06/16/2020 06/27/2022 Final Reclamation Initiated
UAE RS 10-14P Pipeline 3.69 3.69 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 06/29/2022   06/19/2020 06/29/2022 Final Reclamation Initiated
UAE RS 10-25P Pipeline 3.96 3.96     05/29/2015         Final Reclamation Initiated
UAE RS 10-3P Pipeline 6.13 6.13 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/15/2020 06/23/2022 Final Reclamation Initiated
UAE RS 11-13BP Pipeline 0.40 0.40 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/05/2022   06/19/2020 07/05/2022 Final Reclamation Initiated
UAE RS 11-13P Pipeline 1.76 1.76 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/18/2020 06/30/2022 Final Reclamation Initiated
UAE RS 11-14P Pipeline 1.77 1.77 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/07/2019 06/28/2022   06/22/2020 08/01/2022 Final Reclamation Initiated
UAE RS 1-14BP Pipeline 0.77 0.77 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/05/2022   06/22/2020 07/05/2022 Final Reclamation Initiated
UAE RS 1-14DP Pipeline 1.46 1.46 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/07/2019 06/29/2022   06/18/2020 06/29/2022 Final Reclamation Initiated
UAE RS 1-14P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   05/29/2014       Final Reclamation Initiated
UAE RS 1-17P Pipeline 5.13 5.13 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/05/2022   06/24/2020 07/05/2022 Final Reclamation Initiated
UAE RS 12-13P Pipeline 12.40 12.40 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/19/2020 06/29/2022 Final Reclamation Initiated
UAE RS 1-24BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/05/2014       Final Reclamation Initiated
UAE RS 12-9P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/29/2014       Final Reclamation Initiated
UAE RS 13-313 Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/29/2014       Reclamation Not Initiated
UAE RS 13-3BP Pipeline 5.61 5.61 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 08/02/2022   06/15/2020 08/02/2022 Final Reclamation Initiated
UAE RS 13-3P Pipeline 3.27 3.27 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/15/2020 07/28/2022 Final Reclamation Initiated
UAE RS 1-3BP Pipeline 0.64 0.64 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/10/2020 08/01/2022 Final Reclamation Initiated
UAE RS 1-3P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE RS 14-14P Pipeline 3.80 3.80 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/29/2022   06/22/2020 06/29/2022 Final Reclamation Initiated
UAE RS 14-24P Pipeline 5.27 5.27 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/01/2022   06/22/2020 06/29/2022 Final Reclamation Initiated
UAE RS 14-26P Pipeline 3.07 3.07     05/29/2015         Final Reclamation Initiated
UAE RS 15-12P Pipeline 1.81 1.81 10/01/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/06/2022   06/18/2020 07/06/2022 Final Reclamation Initiated
UAE RS 15-13BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/05/2014       Final Reclamation Initiated
UAE RS 15-13P Pipeline 11.36 11.36 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/30/2022   06/19/2020 06/30/2022 Final Reclamation Initiated
UAE RS 15-14BP Pipeline 0.53 0.53 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/05/2022   06/22/2020 07/05/2022 Final Reclamation Initiated
UAE RS 15-14P Pipeline 0.43 0.43 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/22/2020 07/05/2022 Final Reclamation Initiated
UAE RS 15-35P Pipeline 0.37 0.37     05/29/2015         Final Reclamation Initiated
UAE RS 15-8P Pipeline 3.10 3.10 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/05/2022   06/15/2020 07/05/2022 Final Reclamation Initiated
UAE RS 16-14P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/04/2014       Final Reclamation Initiated
UAE RS 16-4B Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/29/2014       Final Reclamation Initiated
UAE RS 16-4P Pipeline 1.42 1.42 06/09/2016 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/15/2020 06/29/2022 Final Reclamation Initiated
UAE RS 1-9P Pipeline 6.73 6.73 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/28/2022   06/15/2020 06/27/2022 Final Reclamation Initiated
UAE RS 2-13P Pipeline 3.00 3.00 10/01/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 06/28/2022   06/18/2020 06/27/2022 Final Reclamation Initiated
UAE RS 2-14BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   05/29/2014       Final Reclamation Initiated
UAE RS 2-14BP Pipeline 2.09 2.09 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/07/2019 07/05/2022   06/18/2020 07/05/2022 Final Reclamation Initiated
UAE RS 2-14P Pipeline 1.35 1.35 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/18/2020 08/02/2022 Final Reclamation Initiated
UAE RS 2-24P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/05/2014       Final Reclamation Initiated
UAE RS 2-3P Pipeline 1.47 1.47 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/23/2022   06/11/2020 08/02/2022 Final Reclamation Initiated
UAE RS 2-4P Pipeline 5.92 5.92 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/15/2020 06/29/2022 Final Reclamation Initiated
UAE RS 3-25P Pipeline 4.61 4.61 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/22/2020 06/29/2022 Final Reclamation Initiated
UAE RS 3-2P Pipeline 0.86 0.86 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/28/2022   06/09/2020 08/01/2022 Final Reclamation Initiated
UAE RS 3-3P Pipeline 3.25 3.25 09/12/2008 Sagebrush-dominated w/ Sandy Soils 10/31/2016 06/27/2022   06/15/2020 07/28/2022 Final Reclamation Initiated
UAE RS 3-9P Pipeline 3.01 3.01 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022   06/16/2020 06/23/2022 Final Reclamation Initiated
UAE RS 4-13BP Pipeline 1.09 1.09 10/01/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/06/2022   06/18/2020 07/06/2022 Final Reclamation Initiated
UAE RS 4-13P Pipeline 1.43 1.43 09/12/2008 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/06/2022   06/18/2020 07/06/2022 Final Reclamation Initiated
UAE RS 4-23P Pipeline 1.99 1.99 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/22/2020 06/29/2022 Final Reclamation Initiated
UAE RS 4-24BP Pipeline 1.07 1.07 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/05/2022   06/18/2020 07/05/2022 Final Reclamation Initiated
UAE RS 4-24P Pipeline 3.37 3.37 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2014 07/05/2022   06/18/2020 07/05/2022 Final Reclamation Initiated
UAE RS 4-25P Pipeline 1.12 1.12 10/25/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 06/30/2022   06/22/2020 08/01/2022 Final Reclamation Initiated
UAE RS 4-2P Pipeline 7.20 7.20 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/28/2022   06/10/2020 08/01/2022 Final Reclamation Initiated
UAE RS 4-35P Pipeline 3.04 3.04     05/29/2015         Final Reclamation Initiated
UAE RS 5-13BP Pipeline 1.37 1.37 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 06/29/2022   06/18/2020 06/29/2022 Final Reclamation Initiated
UAE RS 5-13P Pipeline 11.92 11.92 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/27/2022   06/18/2020 08/01/2022 Final Reclamation Initiated
UAE RS 5-2BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE RS 6-13BP Pipeline 1.85 1.85 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/29/2022   06/18/2020 06/29/2022 Final Reclamation Initiated
UAE RS 6-13P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/03/2014       Final Reclamation Initiated
UAE RS 6-9P Pipeline 3.25 3.25 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/15/2020 07/28/2022 Final Reclamation Initiated
UAE RS 7-23P Pipeline 0.77 0.77 10/15/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/06/2022   06/22/2020 07/06/2022 Final Reclamation Initiated
UAE RS 7-24P Pipeline 5.21 5.21 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/30/2022   06/22/2020 06/30/2022 Final Reclamation Initiated
UAE RS 7-3P Pipeline 0.86 0.86 09/12/2008 Sagebrush-dominated w/ Sandy Soils 10/31/2016 06/27/2022   06/15/2020 06/27/2022 Final Reclamation Initiated
UAE RS 8-14P Pipeline 13.74 13.74 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/29/2022   06/22/2020 08/01/2022 Final Reclamation Initiated
UAE RS 8-23P Pipeline 3.13 3.13 10/15/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/06/2022   06/18/2020 07/06/2022 Final Reclamation Initiated
UAE RS 8-24P Pipeline 11.21 11.21 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/30/2022   06/22/2020 06/30/2022 Final Reclamation Initiated
UAE RS 8-3P Pipeline 8.28 8.28 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/30/2022   06/11/2020 06/29/2022 Final Reclamation Initiated
UAE RS 8-4P Pipeline 1.54 1.54 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/27/2022   06/15/2020 07/28/2022 Final Reclamation Initiated
UAE RS 9-14P Pipeline 4.64 4.64 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/27/2022   06/19/2020 06/27/2022 Final Reclamation Initiated
UAE RS 9-3P Pipeline 4.45 4.45 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/30/2022   06/15/2020 08/02/2022 Final Reclamation Initiated
UAE SLdr 7-9 (UTE) Reference Point               07/05/2018 07/05/2018  
UAE SP 10-17P Pipeline 2.77 2.77 08/10/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/27/2019 07/23/2020 Final Reclamation Initiated
UAE SP 10-6P Pipeline 2.27 2.27 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/07/2022   06/26/2019 06/06/2022 Final Reclamation Initiated
UAE SP 11-32P Pipeline 6.53 6.53 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2022   06/08/2016 06/22/2022 Final Reclamation Initiated
UAE SP 11-33P Pipeline 2.80 2.80 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/21/2020   06/18/2019 07/21/2020 Final Reclamation Initiated
UAE SP 11-52 Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/21/2014       Final Reclamation Initiated
UAE SP 1-20P Pipeline 1.62 1.62 10/15/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/23/2020   06/27/2019 07/23/2020 Final Reclamation Initiated
UAE SP 12-18P Pipeline 6.48 6.48 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/23/2022   06/24/2019 06/22/2022 Final Reclamation Initiated
UAE SP 12-29P Pipeline 1.22 1.22 07/12/2009 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/23/2020   06/08/2016 07/23/2020 Final Reclamation Initiated
UAE SP 1-29P Pipeline 2.22 2.22 10/01/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/19/2019 07/23/2020 Final Reclamation Initiated
UAE SP 13-19P Pipeline 8.61 8.61 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2022   06/20/2019 06/22/2022 Final Reclamation Initiated
UAE SP 13-8P Pipeline 5.02 5.02 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022   06/26/2019 06/06/2022 Final Reclamation Initiated
UAE SP 14-19P Pipeline 4.43 4.43 10/15/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/23/2020   06/24/2019 07/23/2020 Final Reclamation Initiated
UAE SP14-21P Pipeline 2.98 2.98 10/01/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/28/2019 07/23/2020 Final Reclamation Initiated
UAE SP 14-30P Pipeline 8.20 8.20 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2022   06/20/2019 06/22/2022 Final Reclamation Initiated
UAE SP 14-8P Pipeline 2.09 2.09 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022   06/26/2019 08/01/2022 Final Reclamation Initiated
UAE SP 15-17P Pipeline 0.45 0.45 08/10/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/27/2019 07/23/2020 Final Reclamation Initiated
UAE SP 15-19P Pipeline 4.10 4.10 10/15/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/23/2020   06/20/2019 07/23/2020 Final Reclamation Initiated
UAE SP 15-29P Pipeline 0.06 0.06 09/08/2012 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/13/2017   06/08/2016 07/13/2017 Final Reclamation Initiated
UAE SP 15-6P Pipeline 1.24 1.24 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022   06/26/2019 08/01/2022 Final Reclamation Initiated
UAE SP 16-13P Pipeline 8.10 8.10 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/23/2022   06/24/2019 06/22/2022 Final Reclamation Initiated
UAE SP 16-32P Pipeline 7.43 7.43 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/21/2020   06/18/2019 07/21/2020 Final Reclamation Initiated
UAE SP 16-33P Pipeline 4.86 4.86 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/21/2020   06/18/2019 07/21/2020 Final Reclamation Initiated
UAE SP 1-7P Pipeline 4.73 4.73 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022   06/26/2019 08/01/2022 Final Reclamation Initiated
UAE SP 19-29P Pipeline 3.21 3.21 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/21/2020   06/08/2016 07/21/2020 Final Reclamation Initiated
UAE SP 2-17P Pipeline 1.40 1.40 08/10/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/24/2019 07/23/2020 Final Reclamation Initiated
UAE SP 2-20P Pipeline 1.90 1.90 10/15/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/28/2019 07/23/2020 Final Reclamation Initiated
UAE SP 2-29P Pipeline 2.28 2.28 10/13/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/19/2019 07/23/2020 Final Reclamation Initiated
UAE SP 2-8P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/21/2014       Final Reclamation Initiated
UAE SP 3-17P Pipeline 2.78 2.78 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022   06/26/2019 06/06/2022 Final Reclamation Initiated
UAE SP 3-28P Pipeline 0.49 0.49 10/01/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/19/2019 07/23/2020 Final Reclamation Initiated
UAE SP 3-28P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/23/2014       Final Reclamation Initiated
UAE SP 3-32P Pipeline 3.41 3.41 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/21/2020   06/19/2019 07/21/2020 Final Reclamation Initiated
UAE SP 4-32P Pipeline 0.68 0.68 06/08/2016 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/05/2022   06/19/2019 07/05/2022 Final Reclamation Initiated
UAE SP 4-33P Pipeline 3.37 3.37 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/21/2020   06/19/2019 07/21/2020 Final Reclamation Initiated
UAE SP 5-17P Pipeline 3.03 3.03 08/10/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/24/2019 07/23/2020 Final Reclamation Initiated
UAE SP 5-17P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/24/2014       Final Reclamation Initiated
UAE SP 5-19P Pipeline 8.98 8.98 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2022   06/24/2019 06/22/2022 Final Reclamation Initiated
UAE SP 5-21P Pipeline 0.70 0.70 10/01/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/28/2019 07/23/2020 Final Reclamation Initiated
UAE SP 5-30P Pipeline 7.48 7.48 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2022   06/20/2019 06/22/2022 Final Reclamation Initiated
UAE SP 5-8P Pipeline 4.68 4.68 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022   06/26/2019 08/01/2022 Final Reclamation Initiated
UAE SP 6-18BP Pipeline 0.66 0.66 09/12/2008 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/24/2019 07/23/2020 Final Reclamation Initiated
UAE SP 6-18P Pipeline 5.63 5.63 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/24/2022   06/24/2019 06/22/2022 Final Reclamation Initiated
UAE SP 6-20P Pipeline 3.90 3.90 10/13/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/28/2019 07/23/2020 Final Reclamation Initiated
UAE SP 6-21P Pipeline 3.60 3.60 10/13/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/28/2019 07/23/2020 Final Reclamation Initiated
UAE SP 6-28P Pipeline 0.72 0.72 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/04/2015 07/23/2020   06/19/2019 07/23/2020 Final Reclamation Initiated
UAE SP 6-32P Pipeline 2.97 2.97 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/21/2020   06/19/2019 07/21/2020 Final Reclamation Initiated
UAE SP 7-17P Pipeline 2.93 2.93 08/10/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/26/2019 07/23/2020 Final Reclamation Initiated
UAE SP 7-18P Pipeline 2.88 2.88 10/13/2016 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/24/2019 07/23/2020 Final Reclamation Initiated
UAE SP 7-20P Pipeline 3.34 3.34 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/23/2020   06/28/2019 07/23/2020 Final Reclamation Initiated
UAE SP 7-31P Pipeline 6.35 6.35 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2022   06/20/2019 06/22/2022 Final Reclamation Initiated
UAE SP 8-18 Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/21/2014       Final Reclamation Initiated
UAE SP 8-18P Pipeline 5.05 5.05 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022   06/24/2019 06/06/2022 Final Reclamation Initiated
UAE SP 8-20P Pipeline 3.72 3.72 09/12/2008 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/23/2020   06/28/2019 07/23/2020 Final Reclamation Initiated
UAE SP 8-32P Pipeline 0.08 0.08 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/05/2022   06/20/2019 07/05/2022 Final Reclamation Initiated
UAE SP 9-7 Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/21/2014       Final Reclamation Initiated
UAE SP 9-7P Pipeline 1.89 1.89 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022   06/26/2019 08/01/2022 Final Reclamation Initiated
UAE Stewart Point 14-32 Pipeline Pipeline 4.53 4.53     10/04/2011         Reclamation Not Initiated
UAE SU 7-9 (UTE) Reference Point               07/04/2018 07/04/2018  
UAE SwCy 10-14 Reference Point               07/05/2018 07/05/2018  
UAE SwLy 10-14 (UTE) Reference Point               07/03/2018 07/13/2018  
UAE SwLy 7-9 (UTE) Reference Point               07/03/2018 07/13/2018  
UAE Sy 7-9 (UTE) Reference Point               07/05/2018 07/05/2018  
UAE Warbonnet 12-2 Pipeline Pipeline 2.65       08/16/2011         Reclamation Not Initiated
UAE Warbonnet 15-11 Pipeline Pipeline 0.76       09/07/2011         Reclamation Not Initiated
UAE Warbonnet 3-14 Pipeline Pipeline 0.43       08/30/2011         Reclamation Not Initiated
UAE Warbonnet 5-24 Pipeline Pipeline 2.06       08/19/2011         Reclamation Not Initiated
UAE Warbonnet 9-8 Pipeline Pipeline 4.03       08/16/2011         Reclamation Not Initiated
UAE WB 10-10P Pipeline 3.81 3.81 09/21/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/23/2020 08/04/2022 Final Reclamation Initiated
UAE WB 10-11BP Pipeline 0.92 0.92 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/23/2020 08/04/2022 Final Reclamation Initiated
UAE WB 10-11P Pipeline 4.74 4.74 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/23/2020 07/05/2022 Final Reclamation Initiated
UAE WB 10-15BP Pipeline 3.17 3.17 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/23/2020 07/05/2022 Final Reclamation Initiated
UAE WB 10-15P Pipeline 25.60 25.60 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/25/2020 07/05/2022 Final Reclamation Initiated
UAE WB 10-23P Pipeline 25.77 25.77 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/06/2022   06/25/2020 07/06/2022 Final Reclamation Initiated
UAE WB 10-25P Pipeline 1.30 1.30 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   07/02/2018 07/04/2022 Final Reclamation Initiated
UAE WB 10-3P Pipeline 4.79 4.79 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/15/2017 06/30/2022 Final Reclamation Initiated
UAE WB 10-4P Pipeline 3.68 3.68 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022     06/30/2022 Final Reclamation Initiated
UAE WB 10-5BP Pipeline 3.46 3.46 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/22/2017 06/30/2022 Final Reclamation Initiated
UAE WB 10-5P Pipeline 2.32 2.32 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/06/2017 06/30/2022 Final Reclamation Initiated
UAE WB 10-9P Pipeline 11.05 11.05 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/20/2017 08/01/2022 Final Reclamation Initiated
UAE WB 11-10BP Pipeline 1.47 1.47 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/22/2017 07/05/2022 Final Reclamation Initiated
UAE WB 11-10P Pipeline 1.89 1.89 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/15/2017 07/04/2022 Final Reclamation Initiated
UAE WB 11-27P Pipeline 9.26 9.26 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 08/04/2020   06/20/2018 08/04/2020 Final Reclamation Initiated
UAE WB 11-33BP Pipeline 0.48 0.48 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/30/2020   06/21/2017 07/30/2020 Final Reclamation Initiated
UAE WB 11-4B Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/18/2014       Final Reclamation Initiated
UAE WB 11-4P Pipeline 21.93 21.93 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/20/2017 06/30/2022 Final Reclamation Initiated
UAE WB 1-15P Pipeline 4.67 4.67 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/19/2018 07/04/2022 Final Reclamation Initiated
UAE WB 1-23P Pipeline 3.02 3.02 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/25/2018 07/05/2022 Final Reclamation Initiated
UAE WB 13-11P Pipeline 0.70 0.70 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/15/2017 07/05/2022 Final Reclamation Initiated
UAE WB 13-24P Pipeline 1.07 1.07 08/03/2020 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/04/2022     07/04/2022 Final Reclamation Initiated
UAE WB 13-27P Pipeline 9.34 9.34 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 08/04/2020   06/20/2018 08/04/2020 Final Reclamation Initiated
UAE WB 13-2P Pipeline 1.23 1.23 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/15/2017 06/30/2022 Final Reclamation Initiated
UAE WB 13-3BP Pipeline 3.04 3.04 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 06/30/2022     06/30/2022 Final Reclamation Initiated
UAE WB 13-3P Pipeline 5.55 5.55 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/15/2017 06/30/2022 Final Reclamation Initiated
UAE WB 14-10P Pipeline 3.96 3.96 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/22/2017 07/04/2022 Final Reclamation Initiated
UAE WB 14-11 Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE WB 14-11P Pipeline 4.63 4.63 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/15/2017 07/04/2022 Final Reclamation Initiated
UAE WB 14-14P Pipeline 1.28 1.28 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/21/2018 07/05/2022 Final Reclamation Initiated
UAE WB 14-24BP Pipeline 0.99 0.99 03/21/2018 Other 03/21/2018 07/06/2022     07/06/2022 Final Reclamation Initiated
UAE WB 14-24P Pipeline 1.45 1.45 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/26/2018 08/01/2022 Final Reclamation Initiated
UAE WB 14-25P Pipeline 1.77 1.77 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   07/02/2018 07/07/2022 Final Reclamation Initiated
UAE WB 14-31P Pipeline 1.57 1.57     06/02/2015         Final Reclamation Initiated
UAE WB 14-33P Pipeline 11.04 11.04 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 08/04/2020   06/25/2018 08/04/2020 Final Reclamation Initiated
UAE WB 14-3P Pipeline 4.61 4.61 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/15/2017 07/05/2022 Final Reclamation Initiated
UAE WB 14-5P Pipeline 3.71 3.71 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/16/2017 06/30/2022 Final Reclamation Initiated
UAE WB 15-10P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/20/2014       Final Reclamation Initiated
UAE WB 15-25P Pipeline 0.75 0.75 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/06/2022   07/02/2018 07/06/2022 Final Reclamation Initiated
UAE WB 15-26AP Pipeline 3.61 3.61 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   07/02/2018 07/05/2022 Final Reclamation Initiated
UAE WB 1526BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE WB 15-26CP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE WB 15-26P Pipeline 3.61 3.61 09/12/2008 Sagebrush-dominated w/ Sandy Soils 07/17/2018 07/06/2022   06/21/2015 07/06/2022 Final Reclamation Initiated
UAE WB 15-3BP Pipeline 0.90 0.90 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/22/2017 06/30/2022 Final Reclamation Initiated
UAE WB 15-3P Pipeline 3.66 3.66 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/15/2017 06/30/2022 Final Reclamation Initiated
UAE WB 15-4P Pipeline 2.84 2.84 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/01/2022   06/15/2017 06/30/2022 Final Reclamation Initiated
UAE WB 1-5P Pipeline 6.20 6.20 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/21/2017 06/30/2022 Final Reclamation Initiated
UAE WB 16-14P Pipeline 1.50 1.50 07/30/2014 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/26/2018 07/05/2022 Final Reclamation Initiated
UAE WB 16-22P Pipeline 7.54 7.54 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 08/04/2020   06/22/2018 08/04/2020 Final Reclamation Initiated
UAE WB 16-23P Pipeline 31.37 31.37 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/06/2022   06/26/2018 07/06/2022 Final Reclamation Initiated
UAE WB 16-26P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE WB 16-5BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/11/2014       Final Reclamation Initiated
UAE WB 16-9P Pipeline 8.41 8.41 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/22/2017 07/04/2022 Final Reclamation Initiated
UAE WB 1-8BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/12/2014       Final Reclamation Initiated
UAE WB 1-8P Pipeline 4.67 4.67 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/16/2017 06/30/2022 Final Reclamation Initiated
UAE WB 1-9P Pipeline 4.81 4.81 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/15/2017 07/04/2022 Final Reclamation Initiated
UAE WB 2-23P Pipeline 3.72 3.72 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/26/2018 07/05/2022 Final Reclamation Initiated
UAE WB 2-27P Pipeline 9.28 9.28 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 08/04/2020   06/20/2018 08/04/2020 Final Reclamation Initiated
UAE WB 2-8P Pipeline 1.84 1.84 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/20/2017 06/30/2022 Final Reclamation Initiated
UAE WB 2-9P Pipeline 18.85 18.85 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/21/2017 07/04/2022 Final Reclamation Initiated
UAE WB 3-10BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/21/2015     09/01/2015 Final Reclamation Initiated
UAE WB 3-10BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/18/2014       Final Reclamation Initiated
UAE WB 3-10CP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/21/2015     09/01/2015 Final Reclamation Initiated
UAE WB 3-10P Pipeline 0.82 0.82 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/20/2017 06/30/2022 Final Reclamation Initiated
UAE WB 3-14P Pipeline 0.85 0.85 09/21/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/18/2015 07/05/2022 Final Reclamation Initiated
UAE WB 3-15P Pipeline 4.45 4.45 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/15/2017 07/04/2022 Final Reclamation Initiated
UAE WB 3-25P Pipeline 3.13 3.13 08/03/2020 Sagebrush-dominated w/ Sandy Soils 03/20/2016 07/04/2022   06/26/2018 07/04/2022 Final Reclamation Initiated
UAE WB 4-10P Pipeline 0.32 0.32 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/22/2017 07/05/2022 Final Reclamation Initiated
UAE WB 4-14P Pipeline 2.25 2.25 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/22/2017 07/04/2022 Final Reclamation Initiated
UAE WB 4-15AP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/19/2014       Final Reclamation Initiated
UAE WB 4-15BP Pipeline 26.42 26.42 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/20/2017 07/05/2022 Final Reclamation Initiated
UAE WB 4-23BP Pipeline 0.46 0.46 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/25/2018 07/05/2022 Final Reclamation Initiated
UAE WB 4-23P Pipeline 2.30 2.30 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/25/2018 07/05/2022 Final Reclamation Initiated
UAE WB 4-3P Pipeline 0.90 0.90 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 08/01/2022     08/01/2022 Final Reclamation Initiated
UAE WB 4-4P Pipeline 17.25 17.25 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/21/2017 06/30/2022 Final Reclamation Initiated
UAE WB 45-12P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE WB 4-9P Pipeline 1.19 1.19 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/20/2017 06/30/2022 Final Reclamation Initiated
UAE WB 5-10P Pipeline 4.92 4.92 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/15/2017 07/04/2022 Final Reclamation Initiated
UAE WB 5-12P Pipeline 1.82 1.82 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/19/2018 07/05/2022 Final Reclamation Initiated
UAE WB 5-15P Pipeline 2.25 2.25 10/17/2017 Sagebrush-dominated w/ Sandy Soils 05/08/2019 07/04/2022     07/04/2022 Final Reclamation Initiated
UAE WB 5-23BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE WB 5-23CP Pipeline 15.15 15.15 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/06/2022   06/25/2018 08/04/2022 Final Reclamation Initiated
UAE WB 5-25BP Pipeline 2.65 2.65 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/04/2022     07/04/2022 Final Reclamation Initiated
UAE WB 5-25BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   07/30/2014       Final Reclamation Initiated
UAE WB 5-25P Pipeline 1.15 1.15 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   07/02/2018 07/05/2022 Final Reclamation Initiated
UAE WB 5-30P Pipeline 2.26 2.26 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/15/2016 07/04/2022   06/26/2018 07/04/2022 Final Reclamation Initiated
UAE WB 5-4P Pipeline 7.33 7.33 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/20/2017 06/30/2022 Final Reclamation Initiated
UAE WB 5-5P Pipeline 3.67 3.67 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/16/2017 06/30/2022 Final Reclamation Initiated
UAE WB 5-9BP Pipeline 0.63 0.63 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/16/2017 08/01/2022 Final Reclamation Initiated
UAE WB 5-9P Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/23/2014       Final Reclamation Initiated
UAE WB 6-23P Pipeline 0.89 0.89 12/20/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/25/2018 07/05/2022 Final Reclamation Initiated
UAE WB 6-25P Pipeline 1.35 1.35 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   07/02/2018 07/04/2022 Final Reclamation Initiated
UAE WB 6-3P Pipeline 3.19 3.19 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/15/2017 08/01/2022 Final Reclamation Initiated
UAE WB 6-4P Pipeline 25.26 25.26 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/02/2022   06/21/2017 06/30/2022 Final Reclamation Initiated
UAE WB 7-15P Pipeline 28.60 28.60 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/19/2018 07/15/2022 Final Reclamation Initiated
UAE WB 7-23P Pipeline 5.80 5.80 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/12/2019 07/06/2022   06/25/2018 07/05/2022 Final Reclamation Initiated
UAE WB 7-25BP Pipeline 2.09 2.09 10/13/2017 Sagebrush-dominated w/ Sandy Soils 03/21/2018 07/04/2022     08/04/2022 Final Reclamation Initiated
UAE WB 7-25P Pipeline 3.04 3.04 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/20/2016 07/04/2022   06/26/2018 08/04/2022 Final Reclamation Initiated
UAE WB 7-33P Pipeline 9.21 9.21 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 08/04/2020   06/20/2018 08/04/2020 Final Reclamation Initiated
UAE WB 7-4P Pipeline 1.47 1.47 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/15/2017 06/30/2022 Final Reclamation Initiated
UAE WB 7-5BP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/20/2014       Final Reclamation Initiated
UAE WB 7-5CP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/11/2014       Final Reclamation Initiated
UAE WB 7-5DP Pipeline     09/12/2008 Sagebrush-dominated w/ Sandy Soils   06/24/2014       Final Reclamation Initiated
UAE WB 7-8BP Pipeline 3.70 3.70 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 06/30/2022   06/16/2017 06/30/2022 Final Reclamation Initiated
UAE WB 7-8P Pipeline 4.88 4.88 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/01/2022   06/16/2017 08/01/2022 Final Reclamation Initiated
UAE WB 8-10P Pipeline 3.02 3.02 07/16/2018 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/15/2017 08/01/2022 Final Reclamation Initiated
UAE WB 8-11P Pipeline 2.67 2.67 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/19/2018 07/04/2022 Final Reclamation Initiated
UAE WB 8-14P Pipeline 1.14 1.14 09/12/2008 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/05/2022   06/21/2018 07/05/2022 Final Reclamation Initiated
UAE WB 8-15BP Pipeline 0.43 0.43 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022   06/25/2018 07/05/2022 Final Reclamation Initiated
UAE WB 8-22P Pipeline 7.94 7.94 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 08/04/2020   06/20/2018 08/04/2020 Final Reclamation Initiated
UAE WB 8-26P Pipeline 23.97 23.97 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/06/2022   07/02/2018 07/06/2022 Final Reclamation Initiated
UAE WB 8-9P Pipeline 1.17 1.17 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/15/2017 08/01/2022 Final Reclamation Initiated
UAE WB 9-23BP Pipeline                   Final Reclamation Initiated
UAE WB 9-23P Pipeline 0.48 0.48 04/04/2018 Other 04/04/2018 07/05/2022     07/05/2022 Final Reclamation Initiated
UAE WB 9-9P Pipeline 15.96 15.96 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022   06/20/2017 07/04/2022 Final Reclamation Initiated
Ultra AN 11-10 Reference Reference Point               06/05/2013 06/05/2013  
Ultra AN 11-10 Road Road 0.12 0.12 10/08/2012 Sagebrush-dominated w/ Alkaline Soils 09/01/2012 07/25/2018     07/25/2018 Final Reclamation Initiated
Ultra AN 11-4 Well Pad 4.71 3.02 10/06/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/05/2022   06/07/2013 08/05/2022 Interim Reclamation Initiated
Ultra AN 1-5 Well Pad 9.49 5.12 10/24/2013 Sagebrush-dominated w/ Sandy Soils 10/18/2013 08/05/2022   06/11/2018 08/05/2022 Interim Reclamation Initiated
Ultra AN 1-9 Well Pad 4.48 3.06 10/07/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/05/2022   06/06/2013 08/05/2022 Interim Reclamation Initiated
Ultra AN 22 Other 1.49 1.49 11/04/2010 Sagebrush-dominated w/ Alkaline Soils 09/02/2012 08/05/2022   06/12/2018 08/05/2022 Final Reclamation Initiated
Ultra AN 2-6 Well Pad 6.82 5.34 11/02/2007 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/06/2022   06/03/2013 08/05/2022 Interim Reclamation Initiated
Ultra AN 2-9 Well Pad 6.32 5.55 10/04/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/05/2022   06/06/2013 08/05/2022 Interim Reclamation Initiated
Ultra AN 7-4 Well Pad 4.62 4.62 10/23/2006 Sagebrush-dominated w/ Alkaline Soils 10/04/2011 08/05/2022   06/07/2013 08/05/2022 Final Reclamation Initiated
Ultra AN 7-4 Reference Reference Point               06/06/2013 06/05/2012  
Ultra AN 7-4 Road Road 1.45 1.45 10/23/2006 Sagebrush-dominated w/ Alkaline Soils 10/04/2011 07/24/2018   06/06/2013 07/24/2018 Final Reclamation Initiated
Ultra AN 8-6 Well Pad 6.32 6.32 10/24/2006 Sagebrush-dominated w/ Alkaline Soils 10/04/2011 08/30/2022   06/10/2013 08/30/2022 Final Reclamation Initiated
Ultra AN 8-6 Road Road 2.55 2.55 10/24/2006 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 07/24/2018   06/03/2013 07/24/2018 Final Reclamation Initiated
Ultra Antelope 11-10 Well Pad 6.37 6.37 10/08/2012 Sagebrush-dominated w/ Alkaline Soils 09/20/2012 08/05/2022   07/20/2020 08/05/2022 Final Reclamation Initiated
Ultra Antelope 11-4 Reference Reference Point               06/07/2013 06/07/2013  
Ultra Antelope 11-4 Road Road                   Reclamation Not Initiated
Ultra Antelope 14-4 Well Pad 7.82 6.24 11/05/2007 Sagebrush-dominated w/ Alkaline Soils 11/06/2011 08/30/2022   05/29/2013 06/15/2021 Interim Reclamation Initiated
Ultra Antelope 14-4 Reference Reference Point               06/07/2013 06/07/2013  
Ultra Antelope 14-4 Road Road 1.03       10/04/2011         Reclamation Not Initiated
Ultra Antelope 1-5 Road Road 1.04       10/04/2011         Reclamation Not Initiated
Ultra Antelope 1-9 Reference Reference Point               06/06/2013 06/04/2012  
Ultra Antelope 1-9 Road Road 0.74       10/04/2011         Reclamation Not Initiated
Ultra Antelope 2-6 Reference Reference Point               06/10/2013 06/10/2013  
Ultra Antelope 2-6 Road Road 1.79       10/04/2011         Reclamation Not Initiated
Ultra Antelope 2-9 Reference Reference Point               06/06/2013 06/04/2012  
Ultra Antelope 2-9 Road Road 0.09       10/04/2011         Reclamation Not Initiated
Ultra Antelope 8-6 Reference Reference Point               06/10/2013 06/10/2013  
Ultra Boulder 10-30 SIMOPS Well Pad 25.27 19.38 10/18/2015 Loamy Soil 10/21/2016 08/03/2022   07/16/2020 08/03/2022 Interim Reclamation Initiated
Ultra Boulder 10-32 SIMOPS Well Pad 13.64 11.09 10/23/2010 Loamy Soil 10/21/2016 08/04/2022   08/20/2019 08/04/2022 Interim Reclamation Initiated
Ultra Boulder 11-19 Road Road 0.37       10/04/2011         Reclamation Not Initiated
Ultra Boulder 12-33 SIMOPS Well Pad 13.00 7.97 11/27/2011 Sagebrush-dominated w/ Sandy Soils 09/04/2013 08/05/2022   07/08/2019 08/04/2022 Interim Reclamation Initiated
Ultra Boulder 1-32 Road Road 0.42       10/04/2011         Reclamation Not Initiated
Ultra Boulder 14-32 Road Road 0.53       10/04/2011         Reclamation Not Initiated
Ultra Boulder 5-19 SIMOPS Well Pad 9.73 6.60 11/06/2013 Other 09/30/2015 08/03/2022   05/31/2018 08/03/2022 Interim Reclamation Initiated
Ultra Boulder 5-30 Simops Well Pad 9.83 7.93 11/10/2013 Loamy Soil 10/17/2015 08/03/2022   05/31/2018 08/03/2022 Interim Reclamation Initiated
Ultra Boulder 7-31 Road Road 0.09       08/26/2011         Site Stabilized
Ultra BR 10-30 SIMOPS Well Pad 20.73   10/18/2015 Loamy Soil 12/18/2014 07/11/2016   07/11/2016 07/11/2016 Reclamation Not Initiated
Ultra BR 10-31 Well Pad 4.59 3.39 10/23/2010 Loamy Soil 06/10/2013 08/04/2022   06/29/2018 08/04/2022 Interim Reclamation Initiated
Ultra BR 10-32 SIMOPS Well Pad 7.91 3.48 08/13/2013 Loamy Soil 08/25/2014 07/12/2016   07/12/2016 07/13/2016 Interim Reclamation Initiated
Ultra BR 10-33 Well Pad 0.35   10/23/2010 Loamy Soil 12/17/2014 07/10/2014     07/10/2014 Interim Reclamation Initiated
Ultra BR 10-33 Simops Well Pad 6.16   09/01/2008 Sagebrush-dominated w/ Alkaline Soils 09/17/2018 08/04/2022   07/09/2019 08/04/2022 Reclamation Not Initiated
Ultra BR 10-8WDW Well Pad 3.55 3.08 05/13/2019 Other 05/13/2019 08/04/2022     08/04/2022 Reclamation Not Initiated
Ultra BR 11-18 SIMOPS Well Pad 24.89 16.87 11/11/2015 Sagebrush-dominated w/ Sandy Soils 11/01/2016 08/02/2022   07/14/2020 08/02/2022 Interim Reclamation Initiated
Ultra BR 11-19 Well Pad 10.83 10.74 10/14/2015 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/03/2022   07/20/2020 08/03/2022 Interim Reclamation Initiated
Ultra BR 11-7 Simops Well Pad 17.20   10/26/2016 Other 10/24/2016 08/03/2022     08/02/2022 Reclamation Not Initiated
Ultra BR 1-32 Well Pad 14.89 10.29 10/27/2010 Sagebrush-dominated w/ Alkaline Soils 05/20/2016 08/04/2022   05/29/2018 08/04/2022 Interim Reclamation Initiated
Ultra BR 14-31 Well Pad 6.27 4.26 11/18/2011 Sagebrush-dominated w/ Sandy Soils 02/28/2012 08/04/2022   07/10/2019 08/04/2022 Interim Reclamation Initiated
Ultra BR 14-32 Well Pad 14.25 9.43 10/22/2009 Temporary Reclamation 10/18/2013 08/30/2022   07/16/2020 08/30/2022 Interim Reclamation Initiated
Ultra BR 14-34 Well Pad 13.08 10.83 11/18/2011 Sagebrush-dominated w/ Sandy Soils 09/04/2013 08/03/2022   07/10/2019 08/03/2022 Interim Reclamation Initiated
Ultra BR 14-34 SIMOPS Well Pad 22.70 22.70 06/01/2021 Other 06/01/2021 08/03/2022     08/03/2022 Reclamation Not Initiated
Ultra BR 15-18 Well Pad 9.87 5.10 11/11/2011 Sagebrush-dominated w/ Sandy Soils 02/27/2012 08/02/2022   07/09/2019 08/02/2022 Interim Reclamation Initiated
Ultra BR 15-34 Well Pad 4.67 2.96 10/23/2010 Loamy Soil 02/27/2012 08/04/2022   05/29/2018 08/03/2022 Interim Reclamation Initiated
Ultra BR 16-7 Well Pad 10.37 8.20 11/15/2011 Loamy Soil 02/27/2012 08/03/2022   07/10/2019 08/02/2022 Interim Reclamation Initiated
Ultra BR 4-33 Well Pad 5.34 4.09 10/23/2010 Sagebrush-dominated w/ Sandy Soils 02/27/2012 08/04/2022   05/30/2018 08/04/2022 Interim Reclamation Initiated
Ultra BR 5-19 Well Pad 4.25 2.88 11/17/2009 Other 08/25/2014 08/03/2022   07/20/2020 08/03/2022 Interim Reclamation Initiated
Ultra BR 5-30 Well Pad 4.37 2.35 01/01/2017 Loamy Soil 10/17/2015 08/03/2022   07/11/2016 08/03/2022 Interim Reclamation Initiated
Ultra BR 6-18 Well Pad 11.01 8.48 10/16/2015 Sagebrush-dominated w/ Sandy Soils 02/27/2012 08/03/2022   07/15/2020 08/03/2022 Interim Reclamation Initiated
Ultra BR 6-20 Simops Well Pad 31.80       10/24/2016       06/10/2021 Reclamation Not Initiated
Ultra BR 6-29 SIMOPS Well Pad 18.12 10.90 10/14/2016 Loamy Soil 10/21/2016 07/07/2021   08/20/2019 07/07/2021 Interim Reclamation Initiated
Ultra BR 6-31 Well Pad 5.03 3.32 10/23/2010 Loamy Soil 02/27/2012 08/04/2022   05/31/2018 08/04/2022 Interim Reclamation Initiated
Ultra BR 6-32 SIMOPS Well Pad 16.17 12.19 11/26/2012 Loamy Soil 09/04/2013 08/03/2022   07/16/2020 08/03/2022 Interim Reclamation Initiated
Ultra BR 7-19 Well Pad 5.82 3.58 11/10/2011 Loamy Soil 08/20/2014 08/04/2022   07/09/2019 08/03/2022 Interim Reclamation Initiated
Ultra BR 7-31 Well Pad 11.48   10/10/2015 Sagebrush-dominated w/ Alkaline Soils 09/30/2015 08/04/2022   07/16/2020 08/04/2022 Site Stabilized
Ultra BR 7-33 Well Pad 5.84 3.61 10/23/2010 Loamy Soil 02/27/2012 08/04/2022   05/31/2018 08/04/2022 Interim Reclamation Initiated
Ultra BR 9-19 Well Pad 4.39 3.38 10/22/2010 Loamy Soil 08/20/2014 08/03/2022     08/03/2022 Interim Reclamation Initiated
Ultra BR 9-19 SIMOPS Well Pad 20.64 15.41 10/15/2015 Loamy Soil 10/01/2015 08/03/2022   07/20/2020 08/03/2022 Interim Reclamation Initiated
Ultra Central LGS Other 16.81 1.35     10/05/2011       08/05/2022 Interim Reclamation Initiated
Ultra Central LGS Road Road 0.40       10/04/2011         Reclamation Not Initiated
Ultra CGF3 Other 7.45 2.57 09/09/2013 Other 09/09/2013 08/03/2022     08/03/2022 Reclamation Not Initiated
Ultra CGF4 Other 5.77       07/18/2013         Reclamation Not Initiated
Ultra Cy 7-9 Reference Point               07/03/2018 07/13/2018  
Ultra Falcon 1-36 Reference Reference Point               06/17/2013 06/13/2012  
Ultra Falcon 8-36 Reference Reference Point               06/12/2013 06/12/2013  
Ultra Gr 7-9 Reference Point               07/03/2018 07/13/2018  
Ultra LD 15-8 Well Pad 4.94 4.94 10/31/2009 Loamy Soil 02/28/2012 08/04/2022   07/20/2020 08/04/2022 Final Reclamation Initiated
Ultra LH 11-8 Well Pad 4.29 2.74 08/03/2017 Other 08/20/2014 08/04/2022   07/14/2020 08/04/2022 Interim Reclamation Initiated
Ultra LH 13-28 Well Pad 4.13 3.05 10/31/2009 Sagebrush-dominated w/ Sandy Soils 09/04/2013 08/04/2022   07/14/2020 08/04/2022 Interim Reclamation Initiated
Ultra LM 11-25 Well Pad 7.71 7.71 11/11/2005 Other 09/22/2011 08/06/2022     08/05/2022 Final Reclamation Initiated
Ultra Ly 10-14 Reference Point               07/03/2018 07/13/2018  
Ultra Ly 7-9 Reference Point               07/04/2018 07/03/2018  
Ultra M 10-16 Well Pad 16.75 12.93 11/07/2010 Other 10/25/2011 07/25/2022     07/25/2022 Interim Reclamation Full Development
Ultra M 10-16 Road Road 0.32       01/09/2014         Interim Reclamation Initiated
Ultra M 10A-16 Well Pad 3.16 2.08 10/01/2013 Other 11/14/2012 07/25/2022     07/25/2022 Interim Reclamation Full Development
Ultra M 11-16 Well Pad 14.54 10.37 11/07/2009 Other 06/17/2010 07/25/2022   07/13/2012 07/25/2022 Interim Reclamation Full Development
Ultra M 11-17 Well Pad 3.79 2.43 11/07/2013 Other 08/11/2009 07/20/2022   06/26/2018 07/19/2022 Interim Reclamation Full Development
Ultra M 11-17 Road Road 1.77       07/02/2013         Interim Reclamation Initiated
Ultra M 11-20 Well Pad 18.42 14.45 11/07/2009 Other 07/08/2009 07/21/2022   07/03/2020 07/20/2022 Interim Reclamation Full Development
Ultra M 11-20 Road Road 0.45       10/12/2011         Interim Reclamation Initiated
Ultra M 11-7 Well Pad 17.20 13.92 11/07/2014 Other 08/04/2015 07/29/2022   06/26/2019 07/28/2022 Interim Reclamation Full Development
Ultra M 11-7 Road Road 0.82       01/09/2014         Interim Reclamation Initiated
Ultra M 11-9 Well Pad 23.61 19.68 11/07/2015 Other 09/26/2017 07/19/2022   07/02/2020 07/19/2022 Interim Reclamation Full Development
Ultra M 11-9 Road Road 1.89       07/15/2011         Interim Reclamation Initiated
Ultra M 12-16 Well Pad 12.97 10.61 11/07/2011 Other 11/14/2012 07/25/2022     07/25/2022 Interim Reclamation Full Development
Ultra M 12-21 Well Pad 10.62 8.13 11/07/2013 Other 06/16/2010 07/20/2022   06/21/2018 07/19/2022 Interim Reclamation Full Development
Ultra M 12-21 Road Road 1.21       09/16/2011         Interim Reclamation Initiated
Ultra M 12-8 Well Pad 11.36 9.33 11/21/2014 Other 08/05/2015 07/20/2022   06/25/2019 07/19/2022 Interim Reclamation Full Development
Ultra M 13-16 Well Pad 18.06 15.19 11/07/2012 Other 07/02/2013 07/20/2022   07/02/2020 07/19/2022 Interim Reclamation Full Development
Ultra M 13-16 Road Road 2.31       01/29/2013         Interim Reclamation Initiated
Ultra M 13-17 Well Pad 8.80 6.31 11/07/2012 Other 07/02/2013 08/30/2022   07/03/2020 08/30/2022 Interim Reclamation Full Development
Ultra M 13-5 Well Pad 14.85 12.08 11/07/2018 Other 11/06/2019 07/20/2022     07/19/2022 Interim Reclamation Initiated
Ultra M 13-5 Road Road 0.50       01/09/2014         Interim Reclamation Initiated
Ultra M 14-16 Well Pad 5.64 2.48 11/07/2011 Other 11/13/2012 07/26/2022     07/25/2022 Interim Reclamation Full Development
Ultra M 14-16 Road Road 0.17       01/09/2014         Interim Reclamation Initiated
Ultra M 15-16 Well Pad 7.82 6.73 11/07/2011 Other 11/13/2012 07/26/2022     07/25/2022 Interim Reclamation Full Development
Ultra M 15-18 Well Pad 19.75 15.85 11/07/2013 Other 07/02/2013 07/21/2022   06/20/2018 07/20/2022 Interim Reclamation Full Development
Ultra M 15-20 Well Pad 30.45 22.14 11/07/2013 Other 06/10/2014 07/21/2022   06/20/2018 07/20/2022 Interim Reclamation Full Development
Ultra M 15-20 Road Road 0.25       10/12/2011         Interim Reclamation Initiated
Ultra M 15-6 Well Pad 8.29 4.89 11/07/2013 Other 06/11/2014 07/28/2022   06/26/2018 07/28/2022 Interim Reclamation Full Development
Ultra M 15-8 Well Pad 19.77 15.76 11/07/2012 Other 07/02/2013 07/20/2022   07/02/2020 07/19/2022 Interim Reclamation Full Development
Ultra M 15-8 Road Road 1.01       01/09/2014         Interim Reclamation Initiated
Ultra M 15-9 Well Pad 8.86 7.12 11/07/2013 Other 06/11/2014 07/20/2022   06/22/2018 07/19/2022 Interim Reclamation Full Development
Ultra M 15-9 Road Road 1.10       07/02/2013         Interim Reclamation Initiated
Ultra M 16-16N Well Pad 6.84 5.98 07/02/2013 Other 07/02/2013 07/25/2022     07/25/2022 Interim Reclamation Full Development
Ultra M 16-16S Well Pad 8.11 6.31 07/02/2013 Sagebrush-dominated w/ Sandy Soils 07/02/2013 07/26/2022     07/25/2022 Interim Reclamation Full Development
Ultra M 16-16S Road Road 0.26       01/30/2013         Interim Reclamation Initiated
Ultra M 16-19 Well Pad 21.11 17.13 11/07/2010 Other 11/13/2012 07/21/2022   06/20/2018 07/20/2022 Interim Reclamation Full Development
Ultra M 16-19 Road Road 0.59       01/09/2014         Interim Reclamation Initiated
Ultra M 1-7 Well Pad 10.15 5.30 11/07/2008 Other 07/16/2009 07/29/2022   06/25/2019 07/28/2022 Interim Reclamation Initiated
Ultra M 3-17 Well Pad 20.97 16.23 11/07/2013 Other 06/10/2014 07/20/2022   06/22/2018 07/19/2022 Interim Reclamation Full Development
Ultra M 3-17 Road Road 0.79       07/02/2013         Interim Reclamation Initiated
Ultra M 3-20 Well Pad 18.39 13.80 11/07/2011 Other 11/13/2012 07/21/2022   06/25/2019 07/20/2022 Interim Reclamation Full Development
Ultra M 3-20 Road Road 2.76       07/15/2011         Interim Reclamation Initiated
Ultra M 3-21 Well Pad 17.89 12.52 11/07/2010 Other 08/13/2009 07/26/2022   06/22/2018 07/25/2022 Interim Reclamation Full Development
Ultra M 3-21 Road Road 0.69       01/09/2014         Interim Reclamation Initiated
Ultra M 3-22 Well Pad 29.05 23.29 11/14/2012 Other 07/02/2013 07/26/2022   07/02/2020 07/25/2022 Interim Reclamation Full Development
Ultra M 3-22 Road Road 1.40       01/30/2013         Interim Reclamation Initiated
Ultra M 3-7 Well Pad 21.35 17.46 11/07/2018 Other 11/06/2019 07/28/2022   07/12/2012 07/28/2022 Reclamation Not Initiated
Ultra M 3-7 Road Road 0.90       08/12/2011         Interim Reclamation Initiated
Ultra M 3-8 Well Pad 6.71 5.90 11/07/2014 Other 08/05/2015 07/20/2022   06/25/2019 07/19/2022 Interim Reclamation Full Development
Ultra M 3-8 Road Road 1.41       09/01/2011         Interim Reclamation Full Development
Ultra M 4-8 Well Pad 4.01 3.42 11/07/2014 Other 08/05/2015 07/20/2022   06/25/2019 07/19/2022 Interim Reclamation Full Development
Ultra M 4-8 Road Road 0.61       01/09/2014         Interim Reclamation Full Development
Ultra M 5-21 Well Pad 10.18 8.25 11/07/2011 Other 11/14/2012 07/20/2022   06/26/2019 07/19/2022 Interim Reclamation Full Development
Ultra M 5-21 Road Road 1.09       01/29/2013         Interim Reclamation Initiated
Ultra M 5-22 Well Pad 5.22 4.40 11/07/2011 Other 11/13/2012 07/26/2022   06/25/2019 07/25/2022 Interim Reclamation Full Development
Ultra M 5-22 Road Road 0.14       01/30/2013         Interim Reclamation Initiated
Ultra M 5-8 Well Pad 17.77 14.31 11/07/2009 Other 09/26/2017 07/20/2022   07/02/2020 07/19/2022 Interim Reclamation Full Development
Ultra M 5-8 Road Road 0.18       10/04/2011         Interim Reclamation Initiated
Ultra M 6-16 Well Pad 35.97 24.22 10/01/2013 Sagebrush-dominated w/ Sandy Soils 06/11/2014 07/27/2022     07/25/2022 Interim Reclamation Full Development
Ultra M 6-5 Well Pad 22.72 18.71 11/07/2010 Other 09/26/2017 07/28/2022   07/01/2020 07/28/2022 Interim Reclamation Full Development
Ultra M 6-5 Road Road 0.59       12/30/2013         Interim Reclamation Initiated
Ultra M 6-6 Well Pad 27.92   11/07/2008 Other 08/04/2015 07/28/2022   07/02/2013 07/28/2022 Reclamation Not Initiated
Ultra M 6-7 Well Pad 15.52 12.51 11/07/2014 Other 08/04/2015 07/28/2022   06/25/2019 07/28/2022 Interim Reclamation Full Development
Ultra M 6-7 Road Road 0.68       01/09/2014         Interim Reclamation Initiated
Ultra M 7-17 Well Pad 18.11 13.58 11/14/2013 Other 07/02/2013 07/21/2022   06/26/2018 07/19/2022 Interim Reclamation Full Development
Ultra M 7-18 Well Pad 19.08 16.57 11/14/2013 Other 10/06/2014 07/21/2022   06/20/2018 07/19/2022 Interim Reclamation Full Development
Ultra M 7-18 Road Road 2.58 1.34     10/06/2014         Interim Reclamation Initiated
Ultra M 7-21 Well Pad 15.95 11.31 11/07/2013 Other 11/13/2012 07/26/2022   06/21/2018 07/25/2022 Interim Reclamation Full Development
Ultra M 7-21 Road Road 0.07       01/09/2014         Interim Reclamation Initiated
Ultra M 7-22 Well Pad 24.16 20.63 11/07/2011 Other 11/13/2012 07/26/2022   06/25/2019 07/25/2022 Interim Reclamation Full Development
Ultra M 7-7 Well Pad 6.29 5.22 11/14/2013 Other 06/11/2014 07/28/2022   06/22/2018 07/28/2022 Interim Reclamation Full Development
Ultra M 7-7 Road Road 0.99       01/09/2014         Interim Reclamation Initiated
Ultra M 7-8 Well Pad 19.05 15.24 11/07/2014 Other 08/05/2015 07/20/2022   06/25/2019 07/19/2022 Interim Reclamation Full Development
Ultra M 7-8 Road Road 1.64       09/01/2011         Interim Reclamation Initiated
Ultra M 8-17 Well Pad 17.92 15.10 07/02/2020 Sagebrush-dominated w/ Sandy Soils 07/02/2013 07/21/2022   07/03/2020 07/20/2022 Interim Reclamation Full Development
Ultra M 8-19 Well Pad 33.93 29.34 11/14/2012 Other 11/13/2012 07/21/2022   07/03/2020 07/20/2022 Interim Reclamation Full Development
Ultra M 8-30 Well Pad 5.60 3.19 11/07/2010 Other 09/30/2010 07/21/2022   06/20/2018 07/20/2022 Interim Reclamation Full Development
Ultra M 8-30 Road Road 3.07       01/09/2014         Interim Reclamation Initiated
Ultra M 9-16 Well Pad 15.47 11.99 07/02/2013 Other 07/02/2013 07/25/2022     07/25/2022 Interim Reclamation Full Development
Ultra M 9-16 Road Road 1.58       01/30/2013         Interim Reclamation Initiated
Ultra M 9-7 Well Pad 4.05 3.15 10/01/2009 Other 08/12/2009 07/20/2022     07/20/2022 Interim Reclamation Full Development
Ultra M 9-7 Road Road 0.41       08/31/2011         Interim Reclamation Initiated
Ultra M 9-8 Well Pad 13.48 10.57 11/07/2017 Other 08/05/2015 07/20/2022   06/25/2019 07/19/2022 Interim Reclamation Full Development
Ultra M 9-8 Road Road 1.27       07/15/2011         Interim Reclamation Initiated
Ultra Mesa 10-26 Road Road 3.24       09/01/2012         Reclamation Not Initiated
Ultra Mesa 11-34 Road Road 0.04       10/04/2011         Reclamation Not Initiated
Ultra Mesa 12-28 Reference Reference Point               06/01/2013 06/01/2013  
Ultra Mesa 12-28 Road Road 0.79       10/04/2011         Reclamation Not Initiated
Ultra Mesa 12-34 Road Road 0.08       10/04/2011         Reclamation Not Initiated
Ultra Mesa 1-27 Road Road 0.34       10/07/2011         Reclamation Not Initiated
Ultra Mesa 1-28 SIMOPS Well Pad 10.61 6.37 11/22/2009 Playas & Other Alkaline Areas 02/28/2012 07/21/2022   07/13/2020 07/20/2022 Interim Reclamation Initiated
Ultra Mesa 13-26 Reference Reference Point               06/24/2013 06/24/2013  
Ultra Mesa 13-26 Road Road 0.14       10/07/2011         Reclamation Not Initiated
Ultra Mesa 13-35 Road Road 1.52       10/04/2011         Reclamation Not Initiated
Ultra Mesa 15-27 SIMOPS Well Pad 15.85 10.05 11/05/2012 Sagebrush-dominated w/ Sandy Soils 10/13/2016 08/30/2022   07/13/2020 08/30/2022 Interim Reclamation Initiated
Ultra Mesa 5-26 Road Road 3.54       10/04/2011         Reclamation Not Initiated
Ultra Mesa 5-33 Road Road 5.65       10/04/2011         Reclamation Not Initiated
Ultra Mesa 7-27 Reference Reference Point               06/20/2013 06/20/2013  
Ultra Mesa 7-27 Road Road 0.88       10/04/2011         Reclamation Not Initiated
Ultra Mesa 7-29 Road Road 1.01 1.01     09/01/2012         Reclamation Not Initiated
Ultra Mesa 9-21 SIMOPS Well Pad 14.48 9.46 11/12/2013 Loamy Soil 11/01/2016 07/21/2022   05/29/2018 07/20/2022 Interim Reclamation Initiated
Ultra MS 10-26 Well Pad 17.21   10/26/2012 Sagebrush-dominated w/ Alkaline Soils 10/31/2016 07/21/2022     07/20/2022 Reclamation Not Initiated
Ultra MS 10-33 Well Pad 12.92 9.80 11/07/2012 Loamy Soil 08/27/2013 07/26/2022   07/13/2020 07/25/2022 Interim Reclamation Initiated
Ultra MS 10-35 SIMOPS Well Pad 12.33 8.45 11/07/2012 Loamy Soil 08/26/2013 08/01/2022   07/14/2020 08/01/2022 Interim Reclamation Initiated
Ultra MS 11-22 Well Pad 7.83 4.89 11/07/2007 Other 02/28/2012 07/21/2022     07/20/2022 Final Reclamation Initiated
Ultra MS 11-34 Well Pad 12.78 9.11 10/26/2013 Sagebrush-dominated w/ Alkaline Soils 05/20/2016 07/26/2022   05/23/2018 07/25/2022 Interim Reclamation Initiated
Ultra MS 12-27 Well Pad 6.05 4.69 11/15/2010 Sagebrush-dominated w/ Sandy Soils 07/01/2013 07/20/2022   05/22/2018 07/25/2022 Interim Reclamation Initiated
Ultra MS 12-27 SIMOPS Well Pad 14.34 8.14 11/29/2011 Sagebrush-dominated w/ Sandy Soils 08/22/2013 07/20/2022   07/01/2019 07/20/2022 Interim Reclamation Initiated
Ultra MS 12-28 Well Pad 20.64 13.00 10/24/2012 Sagebrush-dominated w/ Alkaline Soils 05/13/2019 07/26/2022   06/14/2013 07/25/2022 Interim Reclamation Initiated
Ultra MS 12-33 Well Pad 15.36 10.15 10/01/2014 Sagebrush-dominated w/ Alkaline Soils 09/17/2018 07/26/2022   07/01/2019 07/25/2022 Interim Reclamation Initiated
Ultra MS 12-34 Well Pad 7.03 3.47 10/28/2010 Sagebrush-dominated w/ Alkaline Soils 05/20/2016 07/26/2022   05/23/2018 07/25/2022 Interim Reclamation Initiated
Ultra MS 1-27 Well Pad 6.34 3.50 10/27/2010 Sagebrush-dominated w/ Alkaline Soils 05/20/2016 07/21/2022   05/23/2018 07/20/2022 Interim Reclamation Initiated
Ultra MS 1-29 Well Pad 15.51 9.80 10/09/2012 Sagebrush-dominated w/ Alkaline Soils 10/01/2012 07/26/2022   07/13/2020 07/25/2022 Interim Reclamation Initiated
Ultra MS 1-29 Road Road 1.04       10/07/2011         Reclamation Not Initiated
Ultra MS 13-26 Well Pad 5.29 3.70 10/25/2006 Sagebrush-dominated w/ Alkaline Soils 10/07/2011 07/21/2022   06/24/2013 07/20/2022 Interim Reclamation Initiated
Ultra MS 1-33 Well Pad 7.29 3.90 11/29/2011 Sagebrush-dominated w/ Alkaline Soils 07/28/2016 07/26/2022   07/01/2019 07/25/2022 Interim Reclamation Initiated
Ultra MS 13-35 Well Pad 15.16 8.67 10/05/2012 Sagebrush-dominated w/ Alkaline Soils 07/20/2012 08/01/2022   07/15/2020 08/01/2022 Interim Reclamation Initiated
Ultra MS 1-33 SIMOPS Well Pad 14.37 10.90 11/12/2012 Sagebrush-dominated w/ Alkaline Soils 08/22/2013 07/26/2022   07/13/2020 07/25/2022 Interim Reclamation Initiated
Ultra MS 15-35 Well Pad 7.41 5.19 10/01/2010 Loamy Soil 02/28/2012 08/01/2022   05/22/2018 07/07/2021 Interim Reclamation Initiated
Ultra MS 16-22 Well Pad 8.95 6.86 11/03/2012 Loamy Soil 02/28/2012 07/21/2022   07/15/2020 07/20/2022 Final Reclamation Initiated
Ultra MS 16-28 Well Pad 10.64 8.41 11/05/2010 Playas & Other Alkaline Areas 02/29/2012 07/25/2022   05/24/2018 07/25/2022 Interim Reclamation Initiated
Ultra MS 22-2 Well Pad 5.28 5.28 11/11/2005 Other 09/22/2011 08/05/2022     08/05/2022 Final Reclamation Initiated
Ultra MS 2-35 Well Pad 7.90 4.06 10/01/2008 Loamy Soil 07/01/2013 07/21/2022   07/01/2019 07/20/2022 Interim Reclamation Initiated
Ultra MS 2-35 SIMOPS Well Pad 12.38 10.10 08/15/2013 Loamy Soil 08/26/2014 07/21/2022   05/22/2018 07/20/2022 Interim Reclamation Initiated
Ultra MS 3-27 Well Pad 6.30 4.59 10/01/2008 Loamy Soil 02/29/2012 07/21/2022   07/01/2019 07/20/2022 Interim Reclamation Initiated
Ultra MS 3-27 SIMOPS Well Pad 8.99 6.30 11/05/2012 Loamy Soil 08/22/2013 07/21/2022   07/13/2020 07/20/2022 Interim Reclamation Initiated
Ultra MS 4-27 Well Pad 6.37 4.81 11/07/2007 Other 03/16/2012 07/21/2022     07/20/2022 Interim Reclamation Initiated
Ultra MS 4-34 SIMOPS Well Pad 11.96 7.74 11/05/2012 Loamy Soil 08/22/2013 07/26/2022   07/13/2020 07/25/2022 Interim Reclamation Initiated
Ultra MS 4-35 Well Pad 6.69 4.63 10/17/2015 Sagebrush-dominated w/ Sandy Soils 02/29/2012 07/20/2022   07/14/2020 07/20/2022 Interim Reclamation Initiated
Ultra MS 5-26 Well Pad 15.61 8.84 07/19/2016 Sagebrush-dominated w/ Sandy Soils 10/18/2013 07/20/2022   07/10/2019 07/20/2022 Interim Reclamation Initiated
Ultra MS 5-33 Well Pad 13.58 6.43 10/08/2012 Sagebrush-dominated w/ Alkaline Soils 09/12/2012 07/26/2022   07/13/2020 07/25/2022 Interim Reclamation Initiated
Ultra MS 5-35 Well Pad 5.78 3.19 11/02/2007 Other 02/29/2012 07/21/2022   06/28/2016 07/20/2022 Interim Reclamation Initiated
Ultra MS 6-18 Well Pad 6.16 4.31 10/23/2009 Loamy Soil 02/29/2012 08/04/2022   07/15/2020 08/04/2022 Interim Reclamation Initiated
Ultra MS 6-27 Well Pad 6.31 3.13 11/07/2007 Other 02/29/2012 07/21/2022   06/29/2016 07/20/2022 Interim Reclamation Initiated
Ultra MS 7-27 Well Pad 5.36 4.02 11/04/2004 Sagebrush-dominated w/ Alkaline Soils 10/07/2011 07/21/2022   06/24/2013 07/20/2022 Interim Reclamation Initiated
Ultra MS 7-28 Well Pad 3.65 1.99 07/01/2007 Other 02/29/2012 07/21/2022     07/20/2022 Interim Reclamation Initiated
Ultra MS 7-28 SIMOPS Well Pad 11.43 9.28 11/05/2012 Other 08/22/2013 07/21/2022   07/16/2020 07/20/2022 Interim Reclamation Initiated
Ultra MS 7-29 Well Pad 12.36 7.40 10/18/2012 Sagebrush-dominated w/ Alkaline Soils 07/05/2012 07/26/2022   07/13/2020 07/25/2022 Interim Reclamation Initiated
Ultra MS 7-34 SIMOPS Well Pad 17.22 12.82 12/15/2012 Loamy Soil 08/26/2013 07/26/2022   07/13/2020 07/25/2022 Interim Reclamation Initiated
Ultra MS 8-28 Well Pad 5.03 3.29 11/06/2007 Other 02/29/2012 07/26/2022     07/25/2022 Interim Reclamation Initiated
Ultra MS 9-22 Well Pad 9.38 7.63 10/08/2008 Sagebrush-dominated w/ Sandy Soils 02/29/2012 07/20/2022   07/01/2019 07/20/2022 Final Reclamation Initiated
Ultra MS 9-28 SIMOPS Well Pad 10.03 8.31 11/03/2012 Loamy Soil 08/22/2013 07/26/2022   07/13/2020 07/25/2022 Interim Reclamation Initiated
Ultra MS 9-33 Well Pad 6.21 4.11 11/03/2012 Loamy Soil 07/28/2016 07/26/2022   07/13/2020 07/25/2022 Interim Reclamation Initiated
Ultra MS 9-34 Well Pad 6.92 5.03 10/23/2009 Loamy Soil 02/29/2012 07/26/2022   07/14/2020 07/25/2022 Interim Reclamation Initiated
Ultra MS 9-34 SIMOPS Well Pad 19.27 14.55 11/03/2012 Loamy Soil 08/26/2013 07/27/2022   07/13/2020 07/25/2022 Interim Reclamation Initiated
Ultra New Fork 11-24 Well Pad 3.44 2.28 11/03/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/03/2022   06/19/2013 06/21/2021 Interim Reclamation Initiated
Ultra New Fork 11-24 Reference Reference Point               06/19/2013 06/19/2013  
Ultra New Fork 11-24 Road Road 0.27       10/07/2011         Reclamation Not Initiated
Ultra New Fork 7-3 Well Pad 6.23 4.45 11/01/2003 Sagebrush-dominated w/ Alkaline Soils 10/21/2016 08/01/2022   06/20/2013 08/01/2022 Interim Reclamation Initiated
Ultra New Fork 7-3 Reference Reference Point               06/20/2013 06/01/2013  
Ultra New Fork 7-3 Road Road 0.45       10/04/2011         Reclamation Not Initiated
Ultra New Fork Unit Federal 13-32 Well Pad 4.03 4.03 10/08/2012 Sagebrush-dominated w/ Alkaline Soils 09/12/2012 08/04/2022   07/14/2020 08/04/2022 Final Reclamation Initiated
Ultra New Fork Unit Federal 13-32 Reference Reference Point               06/18/2013 06/18/2013  
Ultra New Fork Unit Federal 13-32 Road Road 0.14   10/08/2012 Sagebrush-dominated w/ Alkaline Soils 10/04/2011 07/19/2018     07/19/2018 Final Reclamation Initiated
Ultra NF 1 Well Pad 6.90 6.90 11/11/2006 Other 09/22/2011 08/06/2022     08/05/2022 Final Reclamation Initiated
Ultra NF 11-8 Well Pad 3.25 3.25 08/02/2017 Other 09/22/2011 08/03/2022   07/14/2020 08/03/2022 Final Reclamation Initiated
Ultra North LGS Other 12.93 1.43     10/05/2011       07/28/2022 Interim Reclamation Initiated
Ultra North LGS Road Road 0.39       10/04/2011         Reclamation Not Initiated
Ultra North Mesa 4-7 Well Pad 5.31 3.77 11/06/2007 Sagebrush-dominated w/ Alkaline Soils 10/07/2011 08/01/2022   06/11/2013 08/01/2022 Interim Reclamation Initiated
Ultra North Mesa 4-7 Reference Reference Point               06/14/2013 06/14/2013  
Ultra North Mesa 4-7 Road Road 1.86       10/04/2011         Reclamation Not Initiated
Ultra North Pinedale 14-8 Well Pad 8.38 4.73 11/10/2011 Temporary Reclamation 05/20/2016 07/27/2022   07/03/2019 07/26/2022 Interim Reclamation Initiated
Ultra North Pinedale 14-8 Road Road 1.00       10/04/2011         Reclamation Not Initiated
Ultra Pinedale Federal 1-14 Well Pad 1.92 1.92 11/14/2011 Sagebrush-dominated w/ Alkaline Soils 11/01/2011 08/03/2022   07/08/2019 08/02/2022 Final Reclamation Initiated
Ultra Pinedale Federal 1-14 Road Road 0.27   11/14/2011 Sagebrush-dominated w/ Alkaline Soils 10/04/2011 07/23/2018   06/04/2014 07/23/2018 Final Reclamation Initiated
Ultra Pinedale Federal 13-19 Well Pad 4.98 4.31 11/02/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/03/2022   06/18/2013 08/03/2022 Interim Reclamation Initiated
Ultra Pinedale Federal 13-19 Reference Reference Point               06/18/2013 06/18/2013  
Ultra Pinedale Federal 13-19 Road Road 1.39       10/04/2011         Reclamation Not Initiated
Ultra Pinedale Federal 13-2A Well Pad 2.21 0.73 10/01/2012 Sagebrush-dominated w/ Alkaline Soils 10/01/2012 08/01/2022   07/15/2020 08/01/2022 Interim Reclamation Initiated
Ultra Pinedale Federal 13-2A Road Road 0.25       10/04/2011         Reclamation Not Initiated
Ultra PRD 23-31 Well Pad 3.10 3.10 11/11/2003 Other 09/22/2011 08/30/2022     08/09/2021 Final Reclamation Initiated
Ultra QEP1 (1A) Reference Point               07/01/2013 07/01/2013  
Ultra QEP2 (1B) Reference Point               07/02/2013 07/02/2013  
Ultra QEP3 (2B) Reference Point               08/02/2017 08/02/2017  
Ultra QEP4 (2A) Reference Point               07/01/2013 07/02/2013  
Ultra QEP5 (5A) Reference Point               08/02/2017 07/02/2013  
Ultra QEP6 (4A) Reference Point               07/03/2013 07/03/2013  
Ultra QEP7 (4B) Reference Point               08/02/2017 07/03/2013  
Ultra QEP8 (5B) Reference Point               08/02/2017 07/03/2013  
Ultra QEP9 (3B) Reference Point               08/02/2017 07/03/2013  
Ultra Rainbow 13-29 Road Road 0.89       05/19/2016         Reclamation Not Initiated
Ultra Rainbow 7-31 Reference Reference Point               06/13/2013 06/13/2013  
Ultra Rainbow 7-31 Road Road 0.21       10/04/2011         Reclamation Not Initiated
Ultra Rainbow 8-31 Road Road 0.35       10/04/2011         Reclamation Not Initiated
Ultra RB 11-31 Well Pad 6.11 4.73 10/06/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/06/2022   06/13/2013 08/05/2022 Interim Reclamation Initiated
Ultra RB 11-31 Reference Reference Point               06/13/2013 06/13/2013  
Ultra RB 11-31 Road Road 0.47       10/04/2011         Reclamation Not Initiated
Ultra RB 13-29 Well Pad 12.80 9.87 10/25/2010 Temporary Reclamation 05/20/2016 08/30/2022   06/05/2018 08/05/2022 Interim Reclamation Initiated
Ultra RB 13-30 Well Pad 7.81 4.79 10/28/2009 Loamy Soil 02/29/2012 08/06/2022   07/14/2020 08/05/2022 Interim Reclamation Initiated
Ultra RB 13-31 Well Pad 6.47 6.47 11/06/2006 Sagebrush-dominated w/ Sandy Soils 10/04/2011 08/05/2022   06/12/2013 08/05/2022 Final Reclamation Initiated
Ultra RB 13-31 Reference Reference Point               06/12/2013 06/12/2013  
Ultra RB 13-31 Road Road 0.99 0.99 11/01/2006 Sagebrush-dominated w/ Alkaline Soils 10/04/2011 07/25/2018   05/31/2013 07/25/2018 Final Reclamation Initiated
Ultra RB 13-32 Well Pad 6.75 4.77 11/05/2009 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/06/2022   07/17/2020 08/05/2022 Interim Reclamation Initiated
Ultra RB 13-32 Reference Reference Point               06/12/2013 06/12/2013  
Ultra RB 13-32 Road Road 0.06       10/04/2011         Reclamation Not Initiated
Ultra RB 14-32 Well Pad 6.19   11/07/2007 Sagebrush-dominated w/ Sandy Soils 10/06/2011 08/05/2022   05/30/2013 08/05/2022 Interim Reclamation Initiated
Ultra RB 14-32 Reference Reference Point               06/13/2013 06/13/2013  
Ultra RB 14-32 Road Road                   Reclamation Not Initiated
Ultra RB 3-32 SIMOPS Well Pad                   Reclamation Not Initiated
Ultra RB 6-30 Well Pad 5.56 2.83 11/19/2011 Sagebrush-dominated w/ Sandy Soils 11/19/2011 08/05/2022   07/02/2019 08/05/2022 Interim Reclamation Initiated
Ultra RB 8-31 Well Pad 9.13 6.87 10/26/2010 Temporary Reclamation 10/02/2015 08/06/2022   06/04/2018 08/05/2022 Interim Reclamation Initiated
Ultra Riverside 10-13 SIMOPS Well Pad 16.10 13.09 11/14/2014 Sagebrush-dominated w/ Sandy Soils 12/18/2014 08/02/2022   07/15/2020 08/02/2022 Interim Reclamation Initiated
Ultra Riverside 11-13 SIMOPS Well Pad 13.59 10.27 10/15/2018 Sagebrush-dominated w/ Sandy Soils 09/17/2018 08/02/2022     08/02/2022 Reclamation Not Initiated
Ultra Riverside 11-25 Road Road 0.86       10/06/2011         Reclamation Not Initiated
Ultra Riverside 11-2 Road Road 0.34       10/04/2011         Reclamation Not Initiated
Ultra Riverside 1-23 Road Road 0.38       10/04/2011         Reclamation Not Initiated
Ultra Riverside 12-3 Road Road 0.94 0.94     09/01/2012         Reclamation Not Initiated
Ultra Riverside 13-3 Reference Reference Point               06/06/2014 06/04/2014  
Ultra Riverside 13-3 Road Road 0.19       10/04/2011         Reclamation Not Initiated
Ultra Riverside 13-4 Reference Reference Point               06/05/2014 06/05/2014  
Ultra Riverside 13-4 Road Road 2.03       10/04/2011         Reclamation Not Initiated
Ultra Riverside 1-3 Road Road 0.20 0.20     09/01/2012         Reclamation Not Initiated
Ultra Riverside 15-12 SIMOPS Well Pad 24.12 17.13 11/15/2016 Sagebrush-dominated w/ Sandy Soils 11/01/2016 08/02/2022   07/08/2019 08/02/2022 Interim Reclamation Initiated
Ultra Riverside 15-14 SIMOPS Well Pad 23.60 17.67     09/19/2019       06/08/2021 Reclamation Not Initiated
Ultra Riverside 16-3 SIMOPS Well Pad 15.40 9.46 11/17/2012 Loamy Soil 08/27/2013 08/01/2022   07/16/2020 08/01/2022 Interim Reclamation Initiated
Ultra Riverside 2-14 Reference Reference Point               06/19/2013 06/19/2013  
Ultra Riverside 2-14 Road Road 0.04       10/04/2011         Reclamation Not Initiated
Ultra Riverside 2-24 Road Road 2.51       10/04/2011         Reclamation Not Initiated
Ultra Riverside 2-2 SIMOPS Well Pad 13.81   11/04/2010 Loamy Soil 09/17/2018 08/03/2021   05/28/2018 08/03/2021 Interim Reclamation Initiated
Ultra Riverside 3-13 SIMOPS Well Pad 25.91 16.41 10/26/2010 Sagebrush-dominated w/ Sandy Soils 09/12/2017 08/02/2022   07/23/2018 08/02/2022 Reclamation Not Initiated
Ultra Riverside 3-3 SIMOPS Well Pad 15.77 12.33 11/16/2012 Loamy Soil 08/27/2013 08/01/2022   07/09/2020 08/01/2022 Interim Reclamation Initiated
Ultra Riverside 4-11 SIMOPS Well Pad 14.70 7.82 11/30/2011 Sagebrush-dominated w/ Sandy Soils 08/28/2013 08/01/2022   07/03/2019 08/01/2022 Interim Reclamation Initiated
Ultra Riverside 5-1 SIMOPS Well Pad 20.42   11/30/2011 Sagebrush-dominated w/ Sandy Soils 11/01/2016 08/01/2022   07/03/2019 08/01/2022 Reclamation Not Initiated
Ultra RIverside 5-2 SIMOPS Well Pad 12.83 7.24 11/16/2012 Sagebrush-dominated w/ Sandy Soils 08/26/2013 08/01/2022   07/16/2020 08/01/2022 Interim Reclamation Initiated
Ultra Riverside 7-13 Road Road 1.29       10/04/2011         Reclamation Not Initiated
Ultra Riverside 8-3 Road Road 0.17 0.17     09/01/2012         Reclamation Not Initiated
Ultra Riverside 9-24 SIMOPS Well Pad 24.57 15.69 10/23/2010 Sagebrush-dominated w/ Sandy Soils 09/13/2017 08/03/2022   05/29/2018 08/03/2022 Interim Reclamation Initiated
Ultra Riverside 9-2 SIMOPS Well Pad 13.12 6.80 08/03/2017 Loamy Soil 08/28/2013 08/01/2022   07/16/2020 08/01/2022 Interim Reclamation Initiated
Ultra RS 10-13 Well Pad 6.51 4.19 11/14/2011 Sagebrush-dominated w/ Sandy Soils 08/26/2014 08/02/2022   07/04/2019 08/02/2022 Interim Reclamation Initiated
Ultra RS 10-23 Well Pad 8.37 4.10 11/16/2011 Sagebrush-dominated w/ Sandy Soils 02/29/2012 08/03/2022   07/08/2019 08/03/2022 Interim Reclamation Initiated
Ultra RS 10-25 Well Pad 5.83 3.91 11/17/2011 Loamy Soil 02/29/2012 08/03/2022   07/08/2019 08/03/2022 Interim Reclamation Initiated
Ultra RS 11-13 Well Pad 10.20 6.22 10/30/2012 Sagebrush-dominated w/ Alkaline Soils 10/14/2012 08/03/2022   07/15/2020 08/02/2022 Interim Reclamation Initiated
Ultra RS 11-13 Road Road 0.78 0.34     09/01/2012         Reclamation Not Initiated
Ultra RS 11-14 Well Pad 5.74 3.93 11/16/2011 Sagebrush-dominated w/ Sandy Soils 03/19/2018 08/02/2022   07/04/2019 08/02/2022 Interim Reclamation Initiated
Ultra RS 11-14 Simops Well Pad 19.45   10/15/2020 Sagebrush-dominated w/ Sandy Soils 03/19/2018 08/02/2022     08/02/2022 Reclamation Not Initiated
Ultra RS 11-16 WDW Well Pad 3.72 2.78 11/15/2011 Loamy Soil 08/28/2013 08/04/2022   07/03/2019 08/04/2022 Interim Reclamation Initiated
Ultra RS 11-2 Well Pad 6.82 2.24 10/05/2012 Sagebrush-dominated w/ Alkaline Soils 06/12/2012 08/01/2022   07/09/2020 08/01/2022 Interim Reclamation Initiated
Ultra RS 11-24 Simops Well Pad 13.48       03/19/2018       06/08/2021 Reclamation Not Initiated
Ultra RS 11-25 Well Pad 14.26 10.99 10/22/2009 Temporary Reclamation 10/18/2013 08/03/2022   07/15/2020 08/03/2022 Interim Reclamation Initiated
Ultra RS 1-23 Well Pad 9.76 6.75 10/21/2009 Sagebrush-dominated w/ Alkaline Soils 05/20/2016 08/03/2022   07/15/2020 08/02/2022 Interim Reclamation Initiated
Ultra RS 12-3 Well Pad 10.98 7.36 10/05/2012 Sagebrush-dominated w/ Alkaline Soils 07/05/2012 07/29/2022   07/09/2020 07/28/2022 Interim Reclamation Initiated
Ultra RS 1-3 Well Pad 11.34 7.47 10/05/2012 Sagebrush-dominated w/ Alkaline Soils 09/01/2012 08/01/2022   07/09/2020 08/01/2022 Interim Reclamation Initiated
Ultra RS 13-12 Well Pad 6.84 4.97 11/15/2011 Loamy Soil 02/29/2012 08/03/2022   07/08/2019 08/02/2022 Interim Reclamation Initiated
Ultra RS 13-3 Well Pad 6.38 4.38 10/17/2009 Sagebrush-dominated w/ Alkaline Soils 10/06/2011 07/29/2022   07/09/2020 07/28/2022 Interim Reclamation Initiated
Ultra RS 1-4 Well Pad 6.05 4.25 11/28/2011 Sagebrush-dominated w/ Sandy Soils 06/06/2013 08/01/2022   07/01/2019 08/01/2022 Interim Reclamation Initiated
Ultra RS 14-4 Well Pad 16.26 11.46 10/17/2009 Sagebrush-dominated w/ Alkaline Soils 07/05/2012 07/29/2022   07/20/2020 07/28/2022 Interim Reclamation Initiated
Ultra RS 1-4 SIMOPS Well Pad 15.53 11.62 11/28/2011 Loamy Soil 08/26/2013 08/30/2022   07/01/2019 08/01/2022 Interim Reclamation Initiated
Ultra RS 15-12 Simops Well Pad 20.54       12/16/2014         Reclamation Not Initiated
Ultra RS 15-14 Well Pad 4.15 2.74 11/27/2011 Sagebrush-dominated w/ Sandy Soils 09/17/2018 08/03/2022   07/04/2019 08/02/2022 Interim Reclamation Initiated
Ultra RS 16-3 Well Pad 6.69 4.79 11/17/2012 Loamy Soil 08/27/2013 08/01/2022   07/16/2020 08/01/2022 Interim Reclamation Initiated
Ultra RS 16-4 Well Pad 7.25 5.26 10/17/2015 Loamy Soil 08/27/2013 07/29/2022   07/15/2020 07/28/2022 Interim Reclamation Initiated
Ultra RS 16-4 SIMOPS Well Pad 15.90 13.77 11/14/2012 Loamy Soil 09/04/2013 07/29/2022   07/15/2020 07/28/2022 Interim Reclamation Initiated
Ultra RS 1-9 Well Pad 5.10 3.89 11/27/2011 Loamy Soil 02/29/2012 08/30/2022   07/03/2019 08/30/2022 Interim Reclamation Initiated
Ultra RS 2-14 Well Pad 8.89 7.42 11/02/2004 Sagebrush-dominated w/ Alkaline Soils 03/19/2018 08/03/2022   06/04/2014 08/02/2022 Interim Reclamation Initiated
Ultra RS 2-14 Simops Well Pad 15.45   10/15/2019 Other 03/19/2018 08/03/2022     08/02/2022 Reclamation Not Initiated
Ultra RS 2-2 Well Pad 5.54 3.99 11/04/2010 Loamy Soil 10/16/2015 08/01/2022   05/28/2018 08/01/2022 Interim Reclamation Initiated
Ultra RS 2-24 Well Pad 11.55 7.21 11/26/2012 Sagebrush-dominated w/ Alkaline Soils 11/01/2012 08/03/2022   07/15/2020 08/02/2022 Interim Reclamation Initiated
Ultra RS 3-3 Well Pad 14.51 10.74 12/06/2011 Loamy Soil 08/27/2013 08/01/2022   07/02/2019 08/01/2022 Interim Reclamation Initiated
Ultra RS 4-10 Well Pad 2.89 1.57 11/28/2011 Loamy Soil 08/27/2013 07/29/2022   07/03/2019 07/28/2022 Interim Reclamation Initiated
Ultra RS 4-10 SIMOPS Well Pad 20.62 16.85 11/15/2012 Loamy Soil 08/27/2013 07/29/2022   07/20/2020 07/28/2022 Interim Reclamation Initiated
Ultra RS 4-23 Well Pad 5.63 4.21 11/15/2011 Sagebrush-dominated w/ Sandy Soils 02/29/2012 08/02/2022   07/04/2019 08/02/2022 Interim Reclamation Initiated
Ultra RS 4-24 Well Pad 22.36 17.27 11/15/2011 Loamy Soil 05/12/2019 08/03/2022   07/07/2016 08/02/2022 Interim Reclamation Initiated
Ultra RS 4-24 Simops Well Pad 22.36 17.19 11/15/2011 Loamy Soil 09/20/2019 08/02/2022     08/02/2022 Reclamation Not Initiated
Ultra RS 4-25 Well Pad 13.01 10.28 11/19/2011 Loamy Soil 02/29/2012 08/03/2022   07/09/2019 08/03/2022 Interim Reclamation Initiated
Ultra RS 6-16 WDW Well Pad 3.94 2.35 11/15/2011 Loamy Soil 08/28/2013 08/30/2022   07/03/2019 06/08/2021 Interim Reclamation Initiated
Ultra RS 7-13 Well Pad 9.99 6.00 10/30/2012 Sagebrush-dominated w/ Alkaline Soils 10/14/2012 08/02/2022   07/15/2020 08/02/2022 Interim Reclamation Initiated
Ultra RS 7-13 Simops Well Pad                   Reclamation Not Initiated
Ultra RS 7-23 Simops Well Pad 15.26       03/19/2018       06/08/2021 Reclamation Not Initiated
Ultra RS 8-3 Well Pad 5.36 2.80 10/08/2012 Sagebrush-dominated w/ Alkaline Soils 09/01/2012 08/01/2022   07/09/2020 08/01/2022 Interim Reclamation Initiated
Ultra RS 8-4 Well Pad 7.15 3.49 11/04/2010 Loamy Soil 02/29/2012 08/01/2022   05/28/2018 07/06/2021 Interim Reclamation Initiated
Ultra RS 9-2 Well Pad 5.57 3.19 11/30/2011 Loamy Soil 08/28/2013 08/01/2022   07/03/2019 08/01/2022 Interim Reclamation Initiated
Ultra RS 9-24 Simops Well Pad 11.11       08/26/2014         Reclamation Not Initiated
Ultra RS 9-4 Well Pad 6.10 4.70 05/28/2018 Loamy Soil 02/29/2012 07/29/2022   05/28/2018 07/28/2022 Interim Reclamation Initiated
Ultra Shell 33b Well Pad 15.55 9.55     12/19/2014         Reclamation Not Initiated
Ultra Sidewinder 3-15 Well Pad 3.89 2.80 06/12/2009 Other 06/12/2009 08/30/2022     08/30/2022 Interim Reclamation Full Development
Ultra SLdr 7-9 Reference Point               07/05/2018 07/03/2017  
Ultra South Mesa 12-14 Water Injection Other 6.24 1.63 11/08/2007 Sagebrush-dominated w/ Alkaline Soils 10/07/2011 08/06/2020   06/19/2013 08/06/2020 Interim Reclamation Initiated
Ultra South Mesa 12-14 Water Injection Reference Reference Point               07/12/2011 07/12/2011  
Ultra South Mesa 12-14 Water Injection Road Road 0.32       10/04/2011         Reclamation Not Initiated
Ultra SP 10-18 Well Pad 11.27 5.60 11/07/2008 Other 07/01/2009 07/19/2022   06/26/2019 07/19/2022 Interim Reclamation Initiated
Ultra SP 10-18 Road Road 0.23       07/25/2011         Interim Reclamation Initiated
Ultra SP 10-7 Well Pad 6.89 4.00 10/29/2012 Sagebrush-dominated w/ Alkaline Soils 10/31/2016 07/27/2022   07/14/2020 07/26/2022 Interim Reclamation Initiated
Ultra SP 10-7 Road Road 1.47       10/04/2011         Reclamation Not Initiated
Ultra SP 11-20 Well Pad 10.47 8.34 11/07/2019 Other 09/17/2020 07/20/2022     07/20/2022 Interim Reclamation Initiated
Ultra SP 11-20 Road Road 1.66       07/15/2011         Interim Reclamation Initiated
Ultra SP 11-21 Well Pad 7.46 5.38 11/07/2010 Other 10/28/2011 07/19/2022   06/27/2018 06/22/2021 Interim Reclamation Initiated
Ultra SP 11-21 Road Road 2.07       07/15/2011         Interim Reclamation Initiated
Ultra SP 11-21 Road1 Road 2.97       06/23/2009         Interim Reclamation Initiated
Ultra SP 11-33 Well Pad 15.84 12.30 11/07/2015 Other 11/09/2017 07/20/2022   07/01/2020 07/20/2022 Interim Reclamation Full Development
Ultra SP 11-33 Road Road 1.30       12/30/2013         Interim Reclamation Initiated
Ultra SP 11-34 Well Pad 3.94 3.41 11/07/2013 Other 07/07/2009 07/29/2022   06/26/2018 07/28/2022 Interim Reclamation Full Development
Ultra SP 11-34 Road Road 0.45       07/18/2011         Interim Reclamation Initiated
Ultra SP 12-18 Well Pad 4.04       11/06/2018         Reclamation Not Initiated
Ultra SP 12-29 Well Pad 17.47 14.65 11/07/2019 Other 11/06/2019 07/21/2022   06/30/2018 07/20/2022 Reclamation Not Initiated
Ultra SP 12-29 Road Road 0.62       12/19/2013         Interim Reclamation Initiated
Ultra SP 1-29 Well Pad 13.29 11.09 11/07/2018 Other 11/06/2019 07/19/2022   06/15/2015 07/19/2022 Interim Reclamation Initiated
Ultra SP 1-30 Well Pad 13.33 6.66 11/07/2018 Other 11/09/2017 07/19/2022   07/01/2020 07/19/2022 Interim Reclamation Initiated
Ultra SP 1-30 Road Road 3.11       07/15/2011         Interim Reclamation Initiated
Ultra SP 13-17 Well Pad 14.52       11/06/2018         Reclamation Not Initiated
Ultra SP 14-20 Well Pad 15.93 12.54 11/07/2016 Other 09/11/2017 07/19/2022   06/26/2019 07/19/2022 Interim Reclamation Initiated
Ultra SP 14-20 Road Road 3.87       07/18/2011         Interim Reclamation Initiated
Ultra SP 14-32 Well Pad 12.82 11.00 11/28/2014 Other 10/30/2015 07/28/2022   06/24/2019 07/14/2022 Interim Reclamation Full Development
Ultra SP 14-32 Road Road 0.16       01/09/2014         Interim Reclamation Initiated
Ultra SP 15-17 Well Pad 17.05   11/06/2018 Other 11/06/2018 07/20/2022     07/20/2022 Interim Reclamation Initiated
Ultra SP 15-29 Well Pad 6.06 4.23 11/07/2007 Other 07/02/2009 07/20/2022     07/20/2022 Interim Reclamation Initiated
Ultra SP 15-29 Road Road 1.77       12/19/2013         Interim Reclamation Initiated
Ultra SP 15-33 Well Pad 7.20 6.24 11/07/2008 Other 09/26/2017 07/20/2022   07/01/2020 07/20/2022 Interim Reclamation Full Development
Ultra SP 15-33 Road Road 0.69       12/30/2013         Interim Reclamation Initiated
Ultra SP 15-8 Well Pad 6.25 4.12 11/06/2010 Loamy Soil 02/29/2012 07/27/2022   05/21/2018 07/26/2022 Interim Reclamation Initiated
Ultra SP 16-29 Well Pad 29.56 23.72 11/07/2016 Other 11/09/2017 07/20/2022   06/29/2019 07/20/2022 Interim Reclamation Initiated
Ultra SP 16-29 Road Road 0.49       12/19/2013         Interim Reclamation Initiated
Ultra SP 16-6 Well Pad 14.96 12.71 10/30/2010 Sagebrush-dominated w/ Alkaline Soils 10/31/2016 07/27/2022   06/21/2018 07/26/2022 Interim Reclamation Initiated
Ultra SP 16-6 Reference Reference Point               06/05/2014 06/06/2014  
Ultra SP 16-6 Road Road 0.53       10/04/2011         Reclamation Not Initiated
Ultra SP 2-20 Well Pad 15.42 12.20 11/07/2010 Other 10/28/2011 07/19/2022   06/27/2018 07/19/2022 Interim Reclamation Initiated
Ultra SP 3-28 Well Pad 35.55 3.85 11/07/2011 Other 11/07/2018 07/19/2022   08/09/2016 07/19/2022 Interim Reclamation Initiated
Ultra SP 3-28 Road Road 0.35       07/15/2011         Interim Reclamation Initiated
Ultra SP 4-21 Well Pad 5.64 4.02 11/07/2008 Other 06/04/2009 07/20/2022   06/26/2019 07/19/2022 Interim Reclamation Initiated
Ultra SP 4-21 Road Road 2.01       07/18/2011         Interim Reclamation Initiated
Ultra SP 4-32 Well Pad 4.30 3.62 11/07/2013 Other 06/11/2014 07/20/2022   06/30/2018 07/20/2022 Interim Reclamation Full Development
Ultra SP 4-32 Road Road 0.40       12/19/2013         Interim Reclamation Initiated
Ultra SP 4-33 Well Pad 16.63 4.37 11/07/2017 Other 11/09/2017 07/20/2022   06/26/2019 07/20/2022 Interim Reclamation Initiated
Ultra SP 4-33 Road Road 1.44       07/14/2011         Interim Reclamation Initiated
Ultra SP 5-17 Well Pad 9.60 6.88 11/07/2010 Other 10/28/2011 07/20/2022   06/30/2018 07/19/2022 Interim Reclamation Initiated
Ultra SP 5-17 Road Road 0.44       07/25/2011         Interim Reclamation Initiated
Ultra SP 5-20 Well Pad 13.85 9.65 11/07/2008 Other 06/09/2009 07/19/2022   06/26/2019 07/19/2022 Interim Reclamation Initiated
Ultra SP 5-20 Road Road 1.53       07/15/2011         Interim Reclamation Initiated
Ultra SP 6-32 Well Pad 8.60 6.95 11/07/2014 Other 08/03/2015 07/20/2022   06/26/2019 07/20/2022 Interim Reclamation Full Development
Ultra SP 6-32 Road Road 2.80       12/19/2013         Interim Reclamation Initiated
Ultra SP 7-20 Well Pad 8.70 6.39 11/07/2009 Other 10/28/2011 07/19/2022   07/01/2020 07/19/2022 Interim Reclamation Initiated
Ultra SP 7-20 Road Road 6.28       07/18/2011         Interim Reclamation Initiated
Ultra SP 7-28 Well Pad 5.10 4.30 11/07/2011 Other 07/20/2012 07/19/2022   06/26/2019 07/19/2022 Interim Reclamation Full Development
Ultra SP 7-28 Road Road 2.28 1.16     01/09/2014         Interim Reclamation Initiated
Ultra SP 7-33 Well Pad 10.50       08/03/2015       06/23/2021 Reclamation Not Initiated
Ultra SP 7-33 Road Road 0.38       08/03/2015         Reclamation Not Initiated
Ultra SP 8-32 Well Pad 24.74 20.18 11/07/2016 Other 11/09/2017 07/20/2022   06/26/2019 07/20/2022 Interim Reclamation Full Development
Ultra SP 8-32 Road Road 2.38       01/09/2014         Interim Reclamation Initiated
Ultra SP 9-17 Well Pad 9.23 7.54 11/07/2009 Other 06/23/2010 07/19/2022   07/02/2020 07/19/2022 Interim Reclamation Initiated
Ultra SP 9-17E Well Pad 7.79 6.25 11/07/2008 Other 06/04/2009 07/19/2022   07/01/2020 06/22/2021 Interim Reclamation Initiated
Ultra SP 9-20 Well Pad 11.48 8.41 11/07/2018 Other 11/06/2019 07/19/2022     07/19/2022 Interim Reclamation Full Development
Ultra SP 9-33 Well Pad 7.24 5.59 11/07/2009 Other 08/05/2010 07/20/2022   07/01/2020 07/20/2022 Interim Reclamation Initiated
Ultra SP 9-33 Road Road 1.60       07/18/2011         Interim Reclamation Initiated
Ultra Su 7-9 Reference Point               07/04/2018 06/29/2017  
Ultra SwLy 10-14 Reference Point               07/03/2018 07/13/2018  
Ultra SwLy 7-9 Reference Point               07/03/2018 07/13/2018  
Ultra Sy 7-9 Reference Point               07/05/2018 07/05/2018  
Ultra Warbonnet 11-10 Reference Reference Point               06/17/2013 06/13/2012  
Ultra Warbonnet 11-10 Road Road 0.09       10/04/2011         Reclamation Not Initiated
Ultra Warbonnet 11-4 Road Road 0.05       10/04/2011         Reclamation Not Initiated
Ultra Warbonnet 12-9 Road Road 0.76       10/04/2011         Reclamation Not Initiated
Ultra Warbonnet 13-10 Road Road 0.37       10/04/2011         Reclamation Not Initiated
Ultra Warbonnet 13-11 SIMOPS Well Pad 16.46 11.37 10/11/2015 Loamy Soil 09/30/2015 08/30/2022   07/09/2020 08/30/2022 Interim Reclamation Initiated
Ultra Warbonnet 14-5 SIMOPS Well Pad 17.29 10.43 11/20/2011 Loamy Soil 02/29/2012 08/03/2022   07/10/2019 08/03/2022 Interim Reclamation Initiated
Ultra Warbonnet 15-4 SIMOPS Well Pad 13.76 9.77 11/20/2011 Sagebrush-dominated w/ Sandy Soils 02/29/2012 08/30/2022   07/08/2019 08/30/2022 Interim Reclamation Initiated
Ultra Warbonnet 6-5 SIMOPS Well Pad 12.27 6.39 05/23/2011 Loamy Soil 02/29/2012 08/03/2022   07/10/2019 08/03/2022 Interim Reclamation Initiated
Ultra Warbonnet 8-11 SIMOPS Well Pad 24.19 19.20 11/09/2016 Sagebrush-dominated w/ Sandy Soils 11/01/2016 08/04/2022   07/10/2019 08/04/2022 Interim Reclamation Initiated
Ultra Warbonnet 9-23 Simops Well Pad 20.58 1.79 10/10/2007 Loamy Soil 10/01/2015 08/04/2022     08/04/2022 Interim Reclamation Initiated
Ultra Warbonnet Pipeline Reference 1 Reference Point               07/12/2011 07/12/2011  
Ultra Warbonnet Pipeline Reference 2 Reference Point               07/12/2011 07/12/2011  
Ultra Warbonnet Pipeline Reference 3 Reference Point               07/12/2011 07/12/2011  
Ultra Warbonnet Pipeline Reference 4 Reference Point               07/12/2011 07/12/2011  
Ultra WB 10-23 Well Pad 4.61 4.61 10/10/2007 Other 09/22/2011 08/04/2022     08/04/2022 Final Reclamation Initiated
Ultra WB 10-24 Well Pad 5.26 3.24 10/23/2010 Loamy Soil 02/29/2012 08/05/2022   06/05/2018 08/05/2022 Interim Reclamation Initiated
Ultra WB 10-4 Well Pad 6.86 3.11 10/22/2010 Loamy Soil 08/21/2014 08/03/2022   06/04/2018 08/03/2022 Interim Reclamation Initiated
Ultra WB 10-9 Well Pad 6.07 4.77 07/07/2020 Loamy Soil 09/09/2013 08/04/2022   07/07/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 1-10 Well Pad 7.21 2.63 11/23/2011 Loamy Soil 02/29/2012 08/03/2022   07/09/2019 08/03/2022 Interim Reclamation Initiated
Ultra WB 1-10 SIMOPS Well Pad 14.33 8.87 11/23/2011 Loamy Soil 02/29/2012 08/03/2022   07/09/2019 08/03/2022 Interim Reclamation Initiated
Ultra WB 11-10 Well Pad 6.37 4.36 11/15/2008 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/04/2022   07/09/2019 08/04/2022 Interim Reclamation Initiated
Ultra WB 11-23 Well Pad 6.67 4.75 11/19/2011 Loamy Soil 02/29/2012 08/04/2022   07/09/2019 08/04/2022 Interim Reclamation Initiated
Ultra WB 11-25 Well Pad 7.65 5.45 10/28/2010 Loamy Soil 02/29/2012 08/04/2022   06/05/2018 08/04/2022 Interim Reclamation Initiated
Ultra WB 11-4 Well Pad 10.26 5.93 10/26/2010 Temporary Reclamation 05/20/2016 08/03/2022   06/04/2018 08/03/2022 Interim Reclamation Initiated
Ultra WB 1-21 Well Pad 12.14 5.05 10/28/2009 Loamy Soil 02/29/2012 08/04/2022   07/08/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 12-12 Well Pad 9.84 9.84 10/23/2010 Loamy Soil 10/23/2010 08/04/2022   05/27/2015 08/04/2022 Final Reclamation Initiated
Ultra WB 12-24 Well Pad 5.93 5.93 10/23/2010 Loamy Soil 10/23/2010 08/05/2022   06/05/2018 08/05/2022 Final Reclamation Initiated
Ultra WB 12-2 Simops Well Pad 16.80       09/30/2015         Reclamation Not Initiated
Ultra WB 12-2 Simops Well Pad 21.34   10/22/2020 Loamy Soil 10/20/2016 08/03/2022   05/26/2015 08/03/2022 Reclamation Not Initiated
Ultra WB 12-3 SIMOPS Well Pad 15.51 11.22 12/04/2012 Loamy Soil 09/09/2013 08/30/2022   07/07/2020 08/30/2022 Interim Reclamation Initiated
Ultra WB 12-9 Well Pad 12.08 8.08 10/26/2010 Temporary Reclamation 05/20/2016 08/03/2022   06/04/2018 08/03/2022 Interim Reclamation Initiated
Ultra WB 13-10 Well Pad 9.72 5.70 11/03/2011 Sagebrush-dominated w/ Alkaline Soils 09/11/2011 08/04/2022   07/09/2019 08/04/2022 Interim Reclamation Initiated
Ultra WB 13-11 Well Pad 5.27 1.00     02/29/2012         Reclamation Not Initiated
Ultra WB 13-13 Well Pad 5.08 3.03 11/23/2010 Loamy Soil 02/29/2012 08/04/2022   06/05/2018 08/04/2022 Interim Reclamation Initiated
Ultra WB 13-13 Simops Well Pad 31.30 22.44 11/01/2016 Sagebrush-dominated w/ Sandy Soils 09/23/2019 08/04/2022   07/09/2019 08/04/2022 Site Stabilized
Ultra WB 13-13 SIMOPS Well Pad 22.92       12/18/2014         Reclamation Not Initiated
Ultra WB 13-14 Well Pad 12.38 7.59 11/03/2011 Sagebrush-dominated w/ Alkaline Soils 05/20/2016 08/30/2022   07/09/2019 08/30/2022 Interim Reclamation Initiated
Ultra WB 13-14 Road Road 0.79       10/04/2011         Reclamation Not Initiated
Ultra WB 13-19 Well Pad 5.79 5.79 11/17/2009 Loamy Soil 02/29/2012 08/30/2022   07/17/2020 08/30/2022 Final Reclamation Initiated
Ultra WB 13-23 Well Pad 4.25 4.25 11/28/2012 Loamy Soil 10/23/2010 08/04/2022   07/20/2020 08/04/2022 Final Reclamation Initiated
Ultra WB 13-24 Well Pad 6.14 4.11 10/28/2009 Loamy Soil 02/29/2012 08/04/2022   07/08/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 15-10 SIMOPS Well Pad 11.29 7.32 12/04/2012 Loamy Soil 08/21/2013 08/04/2022   07/07/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 15-11 Simops Well Pad 18.58 15.21 10/15/2015 Loamy Soil 06/07/2017 08/04/2022   07/08/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 15-11 Simops Well Pad 18.32 14.64 10/10/2015 Sagebrush-dominated w/ Sandy Soils 10/01/2015 09/09/2016       Interim Reclamation Initiated
Ultra WB 15-23 Well Pad 1.93 0.49 10/10/2007 Other 02/29/2012 08/04/2022     08/04/2022 Interim Reclamation Initiated
Ultra WB 15-26 WDW Well Pad 8.42 3.28 10/09/2015 Loamy Soil 10/16/2015 08/31/2022   07/08/2020 06/16/2021 Interim Reclamation Initiated
Ultra WB 15-3 Well Pad 6.21 3.32 10/22/2010 Loamy Soil 02/29/2012 08/03/2022   06/04/2018 08/03/2022 Interim Reclamation Initiated
Ultra WB 15-5 SIMOPS Well Pad 15.99 9.78 11/20/2011 Loamy Soil 07/01/2013 08/03/2022   07/10/2019 08/03/2022 Interim Reclamation Initiated
Ultra WB 16-10 Well Pad 8.26 5.12 11/28/2011 Loamy Soil 02/29/2012 08/04/2022   07/09/2019 08/04/2022 Interim Reclamation Initiated
Ultra WB 16-25 Well Pad 5.02 3.44 11/19/2011 Loamy Soil 02/29/2012 08/05/2022   07/02/2019 08/05/2022 Interim Reclamation Initiated
Ultra WB 16-4 Well Pad 6.73 4.37 10/18/2007 Loamy Soil 02/29/2012 08/04/2022     08/03/2022 Interim Reclamation Initiated
Ultra WB 16-5 Well Pad 6.75 4.09 11/26/2009 Loamy Soil 02/29/2012 08/03/2022   07/08/2020 08/03/2022 Interim Reclamation Initiated
Ultra WB 1-9 Well Pad 12.56 7.88 10/29/2009 Sagebrush-dominated w/ Sandy Soils 05/20/2016 08/04/2022   07/08/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 1-9 Reference Reference Point               06/05/2014 06/05/2014  
Ultra WB 1-9 Road Road 0.14       10/04/2011         Reclamation Not Initiated
Ultra WB 2-8 Well Pad 6.62 3.51 10/18/2007 Loamy Soil 02/29/2012 08/03/2022     08/03/2022 Interim Reclamation Initiated
Ultra WB 2-8 SIMOPS Well Pad 11.73 9.47 11/03/2010 Loamy Soil 02/29/2012 08/03/2022   06/06/2018 08/03/2022 Interim Reclamation Initiated
Ultra WB 3-10 Well Pad 7.01 5.12 11/21/2011 Loamy Soil 09/09/2013 08/03/2022   07/09/2019 08/03/2022 Interim Reclamation Initiated
Ultra WB 3-10 SIMOPS Well Pad 10.54 6.96 11/21/2011 Loamy Soil 09/09/2013 08/03/2022   07/09/2019 08/03/2022 Interim Reclamation Initiated
Ultra WB 3-14 Simops Well Pad 7.74 5.50 10/28/2010 Loamy Soil 02/29/2012 08/04/2022   06/06/2018 08/04/2022 Interim Reclamation Initiated
Ultra WB 3-22 Well Pad 7.73 7.73 10/28/2010 Loamy Soil 09/22/2011 08/30/2022   06/12/2018 08/30/2022 Final Reclamation Initiated
Ultra WB 3-3 Well Pad 7.29 5.33 10/28/2009 Loamy Soil 02/29/2012 08/03/2022   07/07/2020 08/03/2022 Interim Reclamation Initiated
Ultra WB 4-10 Well Pad 9.86 7.02 10/28/2010 Loamy Soil 02/29/2012 08/03/2022   06/06/2018 08/03/2022 Interim Reclamation Initiated
Ultra WB 4-23 Well Pad 5.91 3.98 10/23/2010 Loamy Soil 02/29/2012 08/04/2022   06/07/2018 08/04/2022 Interim Reclamation Initiated
Ultra WB 4-25 Well Pad 5.94 3.75 11/19/2011 Loamy Soil 02/29/2012 08/04/2022   07/02/2019 08/04/2022 Interim Reclamation Initiated
Ultra WB 4-26 Well Pad 4.80 3.62 10/27/2009 Loamy Soil 02/29/2012 08/04/2022   07/09/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 4-9 Well Pad 9.83 4.33 10/12/2015 Loamy Soil 06/28/2013 08/03/2022   07/08/2020 08/03/2022 Interim Reclamation Initiated
Ultra WB 4-9 SIMOPS Well Pad 10.85 7.97 10/12/2015 Loamy Soil 06/28/2013 08/03/2022   07/07/2020 08/03/2022 Interim Reclamation Initiated
Ultra WB 5-12 Well Pad 9.45 3.45 10/28/2010 Loamy Soil 02/29/2012 08/04/2022   06/07/2018 08/04/2022 Interim Reclamation Initiated
Ultra WB 5-13 Well Pad 5.75 3.66 07/13/2021 Loamy Soil 02/29/2012 08/04/2022   06/07/2018 08/04/2022 Interim Reclamation Initiated
Ultra WB 5-14 Well Pad 5.37 3.33 10/01/2010 Loamy Soil 08/21/2013 08/30/2022   06/06/2018 08/30/2022 Interim Reclamation Initiated
Ultra WB 5-14 SIMOPS Well Pad 16.22 13.65 10/27/2013 Loamy Soil 08/21/2014 08/04/2022   06/06/2018 08/04/2022 Interim Reclamation Initiated
Ultra WB 5-15 Simops Well Pad 24.43   11/05/2013 Other 11/01/2016 08/04/2022   06/26/2014 08/04/2022 Reclamation Not Initiated
Ultra WB 5-15 SIMOPS Well Pad 12.75 9.21 11/05/2013 Other 09/01/2014 07/14/2016   07/14/2016 07/14/2016 Interim Reclamation Initiated
Ultra WB 5-23 Well Pad 2.48 0.98 10/10/2007 Other 02/29/2012 08/04/2022     08/04/2022 Interim Reclamation Initiated
Ultra WB 5-24 Well Pad 6.69 3.95 10/23/2010 Loamy Soil 02/29/2012 08/04/2022   06/07/2018 08/04/2022 Interim Reclamation Initiated
Ultra WB 5-25 Well Pad 7.65 4.59 11/27/2009 Loamy Soil 02/29/2012 08/04/2022   07/08/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 5-4 Well Pad 6.68 3.54 10/28/2007 Loamy Soil 02/29/2012 08/05/2022     08/03/2022 Interim Reclamation Initiated
Ultra WB 5-9 Well Pad 7.49 5.41 10/29/2010 Loamy Soil 02/29/2012 08/03/2022   06/06/2018 08/03/2022 Interim Reclamation Initiated
Ultra WB 6-23 Well Pad 4.12 2.65 10/23/2010 Loamy Soil 02/29/2012 08/04/2022   06/07/2018 08/04/2022 Interim Reclamation Initiated
Ultra WB 6-26 Well Pad 9.46 3.46 10/27/2009 Loamy Soil 02/29/2012 08/04/2022   07/09/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 6-4 Well Pad 4.92 2.72 10/18/2007 Other 09/09/2013 08/03/2022     08/03/2022 Interim Reclamation Initiated
Ultra WB 6-4 SIMOPS Well Pad 12.13 9.54 11/28/2012 Other 08/21/2014 08/03/2022   07/06/2020 08/03/2022 Interim Reclamation Initiated
Ultra WB 6-5 Well Pad 7.96 4.75 10/26/2009 Loamy Soil 02/29/2012 08/03/2022   07/08/2020 08/03/2022 Interim Reclamation Initiated
Ultra WB 7-15 Well Pad 6.08 3.95 10/21/2010 Loamy Soil 02/29/2012 08/04/2022   06/07/2018 07/05/2022 Interim Reclamation Initiated
Ultra WB 7-23 Simops Well Pad 20.70   10/23/2010 Loamy Soil 11/01/2016 08/04/2022   05/27/2015 08/04/2022 Reclamation Not Initiated
Ultra WB 7-3 Well Pad 7.99 2.87 10/13/2015 Loamy Soil 02/29/2012 08/03/2022   07/07/2020 08/03/2022 Interim Reclamation Initiated
Ultra WB 7-3 SIMOPS Well Pad 15.26 11.56 07/07/2020 Loamy Soil 09/04/2013 08/03/2022   07/07/2020 08/03/2022 Interim Reclamation Initiated
Ultra WB 7-4 Well Pad 4.51 2.31 10/29/2010 Loamy Soil 07/01/2013 08/03/2022   06/11/2018 08/03/2022 Interim Reclamation Initiated
Ultra WB 7-5 Well Pad 10.84 6.50 10/15/2009 Sagebrush-dominated w/ Alkaline Soils 10/18/2013 08/05/2022   07/06/2020 08/05/2022 Interim Reclamation Initiated
Ultra WB 7-5 Reference Reference Point               06/05/2014 06/05/2014  
Ultra WB 7-5 Road Road 0.33       10/04/2011         Reclamation Not Initiated
Ultra WB 7-5 Road Reference Reference Point               07/12/2011 07/12/2011  
Ultra WB 8-11 Well Pad 2.65   10/28/2010 Loamy Soil 12/18/2014 07/09/2014   06/03/2013 07/09/2014 Interim Reclamation Initiated
Ultra WB 8-14 Simops Well Pad 16.26 10.97 10/15/2019 Sagebrush-dominated w/ Sandy Soils 09/20/2019 08/04/2022     08/04/2022 Reclamation Not Initiated
Ultra WB 8-22 Well Pad 6.15 4.26 10/27/2009 Loamy Soil 02/29/2012 08/04/2022   07/08/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 8-25 Well Pad 5.42 3.65 10/28/2009 Loamy Soil 03/19/2018 08/06/2022   06/24/2014 08/05/2022 Interim Reclamation Initiated
Ultra WB 8-25 Simops Well Pad 25.78       03/19/2018       06/17/2021 Reclamation Not Initiated
Ultra WB 8-26 Well Pad 5.51 3.27 10/10/2007 Other 02/29/2012 08/04/2022     08/04/2022 Interim Reclamation Initiated
Ultra WB 8-27 Well Pad 7.73 7.73 06/29/2007 Loamy Soil 09/18/2012 08/04/2022     08/04/2022 Final Reclamation Initiated
Ultra WB 8-4 Well Pad 6.39 4.05 11/27/2012 Loamy Soil 09/09/2013 08/03/2022   07/08/2020 08/03/2022 Interim Reclamation Initiated
Ultra WB 8-4 Simops Well Pad 13.09   10/15/2019 Other 03/19/2018 08/03/2022     08/03/2022 Reclamation Not Initiated
Ultra WB 8-6 Well Pad 14.13 9.39 10/16/2009 Temporary Reclamation 10/18/2013 08/03/2022   07/08/2020 08/03/2022 Interim Reclamation Initiated
Ultra WB 8-6 Road Road 0.91       10/04/2011         Reclamation Not Initiated
Ultra WB 8-8 Well Pad 6.12 3.93 10/29/2010 Loamy Soil 02/29/2012 08/03/2022   06/07/2018 08/03/2022 Interim Reclamation Initiated
Ultra WB 9-14 Simops Well Pad 18.92 11.99 10/23/2010 Loamy Soil 09/30/2015 07/26/2016     07/26/2016 Interim Reclamation Initiated
Ultra WB 9-14 Simops Well Pad 21.74 17.16 10/09/2015 Loamy Soil 10/31/2016 08/04/2022   07/09/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 9-15 Well Pad 7.00 4.06 10/27/2009 Loamy Soil 02/29/2012 08/04/2022   07/09/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 9-26 Well Pad 6.30 3.42 10/28/2009 Loamy Soil 02/29/2012 08/04/2022   07/08/2020 08/04/2022 Interim Reclamation Initiated
Ultra WB 9-8 Well Pad 5.29 2.63 10/29/2010 Loamy Soil 02/29/2012 08/03/2022   06/11/2018 08/03/2022 Interim Reclamation Initiated
7 Operator(s) 1073 Locations           909 w/ Reports 787 w/ Reports 0 w/ Reports 728 w/ Reports 801 w/ Reports
156Status Image Reclamation Not Initiated
330Status Image Interim Reclamation Initiated
1Status Image Final Reclamation Achieved
60Status Image Interim Reclamation Full Development
435Status Image Final Reclamation Initiated
3Status Image Site Stabilized
BLM Wyoming  |  Wyoming Department of Agriculture  |  Wyoming Department of Environmental Quality  |  Wyoming Game & Fish
This is a US Government computer system. PADMS Version 2.4, Last Updated: August 15, 2023 Disclaimer | Privacy Policy