Operator Summary Page: UAE

Map Controls:

Type:

Show Disturbances
Show Reclamation Areas
Show Reference Points

Auto-Zoom to Selection

Operator Summary:

Note: does not include pre-ROD federal surface sites, or reference points.
 Locns.Dist.
Acres
Recl.
Acres
Reclamation Not Initiated 1 0.00 0.00
Site Stabilized 0 0.00 0.00
Interim Reclamation Initiated 0 0.00 0.00
Interim Reclamation Full Development 0 0.00 0.00
Interim Reclamation Achieved 0 0.00 0.00
Final Reclamation Initiated 331 1562.16 1562.14
Final Reclamation Achieved 0 0.00 0.00
Total 332 1562.16 1562.14

Downloads:


Location Summary Table:


Listing:
Name Type Coordinates Dist. Acres Recl. Acres Last Seeding Seed Mix Last Spatial Last Qual. Last Intercept Last Photo Status
M 9-34P Pipeline 42.697552/-109.817037 20.04 20.04 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/27/2022 06/09/2020 06/27/2022 Final Reclamation Initiated
M 9-7BP Pipeline 42.759334/-109.864392 3.79 3.79 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 06/23/2022 06/18/2019 06/23/2022 Final Reclamation Initiated
M 9-7P Pipeline 42.758892/-109.866413 8.66 8.66 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2022 06/18/2019 08/02/2022 Final Reclamation Initiated
RB 10-31P Pipeline 42.522953/-109.642715 3.05 3.05 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022 06/28/2018 07/04/2022 Final Reclamation Initiated
RB 11-31P Pipeline 42.523933/-109.646565 1.01 1.01 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022 06/28/2018 07/04/2022 Final Reclamation Initiated
RB 12-30P Pipeline 42.537251/-109.652066 4.57 4.57 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022 06/21/2018 07/04/2022 Final Reclamation Initiated
RB 13-32P Pipeline 42.519884/-109.633989 4.18 4.18 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022 06/28/2018 07/04/2022 Final Reclamation Initiated
RB 15-31P Pipeline 42.518570/-109.642145 3.12 3.12 10/12/2015 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/04/2022 06/28/2018 07/04/2022 Final Reclamation Initiated
RB 3-31P Pipeline 42.526850/-109.646248 3.12 3.12 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/20/2016 07/04/2022 06/26/2018 07/04/2022 Final Reclamation Initiated
RB 3-32P Pipeline 42.532697/-109.631430 3.15 3.15 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/20/2016 07/04/2022 06/27/2018 07/04/2022 Final Reclamation Initiated
RB 4-31P Pipeline 42.532205/-109.654407 1.14 1.14 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022 06/26/2018 07/04/2022 Final Reclamation Initiated
RB 5-31P Pipeline 42.529745/-109.652079 1.63 1.63 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/20/2016 07/04/2022 06/26/2018 07/04/2022 Final Reclamation Initiated
RB 7-31P Pipeline 42.528305/-109.638003 2.93 2.93 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/20/2016 07/04/2022 06/27/2018 07/04/2022 Final Reclamation Initiated
RB 8-31P Pipeline 42.527412/-109.642996 0.93 0.93 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/20/2016 07/04/2022 06/26/2018 07/04/2022 Final Reclamation Initiated
RB 9-31P Pipeline 42.525612/-109.639872 1.33 1.33 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022 06/28/2018 07/04/2022 Final Reclamation Initiated
RS 1-14BP Pipeline 42.664308/-109.794202 0.77 0.77 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/05/2022 06/22/2020 07/05/2022 Final Reclamation Initiated
RS 1-14DP Pipeline 42.664097/-109.793817 1.46 1.46 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/07/2019 06/29/2022 06/18/2020 06/29/2022 Final Reclamation Initiated
RS 1-17P Pipeline 42.667822/-109.853957 5.13 5.13 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/05/2022 06/24/2020 07/05/2022 Final Reclamation Initiated
RS 1-3BP Pipeline 42.692420/-109.810422 0.64 0.64 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2022 06/10/2020 08/01/2022 Final Reclamation Initiated
RS 1-9P Pipeline 42.679318/-109.835555 6.73 6.73 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/28/2022 06/15/2020 06/27/2022 Final Reclamation Initiated