Operator Summary Page: UAE

Map Controls:

Type:

Show Disturbances
Show Reclamation Areas
Show Reference Points

Auto-Zoom to Selection

Operator Summary:

Note: does not include pre-ROD federal surface sites, or reference points.
 Locns.Dist.
Acres
Recl.
Acres
Reclamation Not Initiated 1 0.00 0.00
Site Stabilized 0 0.00 0.00
Interim Reclamation Initiated 0 0.00 0.00
Interim Reclamation Full Development 0 0.00 0.00
Interim Reclamation Achieved 0 0.00 0.00
Final Reclamation Initiated 331 1562.16 1562.14
Final Reclamation Achieved 0 0.00 0.00
Total 332 1562.16 1562.14

Downloads:


Location Summary Table:


Listing:
Name Type Coordinates Dist. Acres Recl. Acres Last Seeding Seed Mix Last Spatial Last Qual. Last Intercept Last Photo Status
WB 9-23BP Pipeline                 Final Reclamation Initiated
Sy 7-9 (UTE) Reference Point 42.646438/-109.822288             07/05/2018 07/05/2018  
SwLy 7-9 (UTE) Reference Point 42.809066/-109.961683             07/03/2018 07/13/2018  
SwLy 10-14 (UTE) Reference Point 42.762060/-109.813646             07/03/2018 07/13/2018  
SwCy 10-14 Reference Point 42.500000/-109.700000             07/05/2018 07/05/2018  
SU 7-9 (UTE) Reference Point 42.707512/-109.787850             07/04/2018 07/04/2018  
SLdr 7-9 (UTE) Reference Point 42.639561/-109.805783             07/05/2018 07/05/2018  
Ly 7-9 (UTE) Reference Point 42.600782/-109.660845             07/04/2018 07/04/2018  
Ly 10-14 (UTE) Reference Point 42.765871/-109.907108             07/03/2018 07/13/2018  
GR 7-9 (UTE) Reference Point 42.812611/-109.938201             07/03/2018 07/13/2018  
CY 7-9 (UTE) Reference Point 42.790483/-109.909857             07/03/2018 07/13/2018  
AN 11-10BP Pipeline                 Reclamation Not Initiated
SP 10-6P Pipeline 42.855785/-109.909182 2.27 2.27 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/07/2022 06/26/2019 06/06/2022 Final Reclamation Initiated
SP 15-6P Pipeline 42.853892/-109.906072 1.24 1.24 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022 06/26/2019 08/01/2022 Final Reclamation Initiated
SP 1-7P Pipeline 42.850230/-109.904338 4.73 4.73 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022 06/26/2019 08/01/2022 Final Reclamation Initiated
SP 5-8P Pipeline 42.843887/-109.899954 4.68 4.68 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022 06/26/2019 08/01/2022 Final Reclamation Initiated
SP 9-7P Pipeline 42.841444/-109.901968 1.89 1.89 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022 06/26/2019 08/01/2022 Final Reclamation Initiated
SP 14-8P Pipeline 42.838273/-109.890788 2.09 2.09 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022 06/26/2019 08/01/2022 Final Reclamation Initiated
SP 13-8P Pipeline 42.837405/-109.896061 5.02 5.02 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022 06/26/2019 06/06/2022 Final Reclamation Initiated
SP 3-17P Pipeline 42.837259/-109.892162 2.78 2.78 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/06/2022 06/26/2019 06/06/2022 Final Reclamation Initiated