Operator Summary Page: UAE

Map Controls:

Type:

Show Disturbances
Show Reclamation Areas
Show Reference Points

Auto-Zoom to Selection

Operator Summary:

Note: does not include pre-ROD federal surface sites, or reference points.
 Locns.Dist.
Acres
Recl.
Acres
Reclamation Not Initiated 1 0.00 0.00
Site Stabilized 0 0.00 0.00
Interim Reclamation Initiated 0 0.00 0.00
Interim Reclamation Full Development 0 0.00 0.00
Interim Reclamation Achieved 0 0.00 0.00
Final Reclamation Initiated 331 1562.16 1562.14
Final Reclamation Achieved 0 0.00 0.00
Total 332 1562.16 1562.14

Downloads:


Location Summary Table:


Listing:
Name Type Coordinates Dist. Acres Recl. Acres Last Seeding Seed Mix Last Spatial Last Qual. Last Intercept Last Photo Status
AN 11-10BP Pipeline                 Reclamation Not Initiated
CY 7-9 (UTE) Reference Point 42.790483/-109.909857             07/03/2018 07/13/2018  
GR 7-9 (UTE) Reference Point 42.812611/-109.938201             07/03/2018 07/13/2018  
Ly 10-14 (UTE) Reference Point 42.765871/-109.907108             07/03/2018 07/13/2018  
Ly 7-9 (UTE) Reference Point 42.600782/-109.660845             07/04/2018 07/04/2018  
SLdr 7-9 (UTE) Reference Point 42.639561/-109.805783             07/05/2018 07/05/2018  
SU 7-9 (UTE) Reference Point 42.707512/-109.787850             07/04/2018 07/04/2018  
SwCy 10-14 Reference Point 42.500000/-109.700000             07/05/2018 07/05/2018  
SwLy 10-14 (UTE) Reference Point 42.762060/-109.813646             07/03/2018 07/13/2018  
SwLy 7-9 (UTE) Reference Point 42.809066/-109.961683             07/03/2018 07/13/2018  
Sy 7-9 (UTE) Reference Point 42.646438/-109.822288             07/05/2018 07/05/2018  
WB 9-23BP Pipeline                 Final Reclamation Initiated
WB 16-23P Pipeline 42.547568/-109.678429 31.37 31.37 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/06/2022 06/26/2018 07/06/2022 Final Reclamation Initiated
WB 7-15P Pipeline 42.570961/-109.703591 28.60 28.60 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022 06/19/2018 07/15/2022 Final Reclamation Initiated
WB 4-15BP Pipeline 42.576036/-109.710202 26.42 26.42 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022 06/20/2017 07/05/2022 Final Reclamation Initiated
WB 10-23P Pipeline 42.553897/-109.686510 25.77 25.77 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/06/2022 06/25/2020 07/06/2022 Final Reclamation Initiated
WB 10-15P Pipeline 42.564429/-109.700115 25.60 25.60 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022 06/25/2020 07/05/2022 Final Reclamation Initiated
WB 6-4P Pipeline 42.599989/-109.729569 25.26 25.26 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/02/2022 06/21/2017 06/30/2022 Final Reclamation Initiated
BR 9-32P Pipeline 42.612026/-109.736216 24.50 24.50 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/01/2022 06/25/2020 08/01/2022 Final Reclamation Initiated
WB 8-26P Pipeline 42.538186/-109.675777 23.97 23.97 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/06/2022 07/02/2018 07/06/2022 Final Reclamation Initiated