Operator Summary:

Note: does not include pre-ROD federal surface sites, or reference points.
 Locns.Dist.
Acres
Recl.
Acres
Reclamation Not Initiated 1 0.00 0.00
Site Stabilized 0 0.00 0.00
Interim Reclamation Initiated 0 0.00 0.00
Interim Reclamation Full Development 0 0.00 0.00
Interim Reclamation Achieved 0 0.00 0.00
Final Reclamation Initiated 331 1562.16 1562.14
Final Reclamation Achieved 0 0.00 0.00
Total 332 1562.16 1562.14

Downloads:


Location Summary Table:


Listing:
Name Type Coordinates Dist. Acres Recl. Acres Last Seeding Seed Mix Last Spatial Last Qual. Last Intercept Last Photo Status
Sy 7-9 (UTE) Reference Point 42.646438/-109.822288             07/05/2018 07/05/2018  
SwLy 7-9 (UTE) Reference Point 42.809066/-109.961683             07/03/2018 07/13/2018  
SwLy 10-14 (UTE) Reference Point 42.762060/-109.813646             07/03/2018 07/13/2018  
SwCy 10-14 Reference Point 42.500000/-109.700000             07/05/2018 07/05/2018  
SU 7-9 (UTE) Reference Point 42.707512/-109.787850             07/04/2018 07/04/2018  
SLdr 7-9 (UTE) Reference Point 42.639561/-109.805783             07/05/2018 07/05/2018  
Ly 7-9 (UTE) Reference Point 42.600782/-109.660845             07/04/2018 07/04/2018  
Ly 10-14 (UTE) Reference Point 42.765871/-109.907108             07/03/2018 07/13/2018  
GR 7-9 (UTE) Reference Point 42.812611/-109.938201             07/03/2018 07/13/2018  
CY 7-9 (UTE) Reference Point 42.790483/-109.909857             07/03/2018 07/13/2018  
WB 9-9P Pipeline 42.580189/-109.718067 15.96 15.96 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022 06/20/2017 07/04/2022 Final Reclamation Initiated
WB 9-23P Pipeline 42.550957/-109.678213 0.48 0.48 04/04/2018 Other 04/04/2018 07/05/2022   07/05/2022 Final Reclamation Initiated
WB 9-23BP Pipeline                 Final Reclamation Initiated
WB 8-9P Pipeline 42.586127/-109.718761 1.17 1.17 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022 06/15/2017 08/01/2022 Final Reclamation Initiated
WB 8-26P Pipeline 42.538186/-109.675777 23.97 23.97 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/06/2022 07/02/2018 07/06/2022 Final Reclamation Initiated
WB 8-22P Pipeline 42.559384/-109.699338 7.94 7.94 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 08/04/2020 06/20/2018 08/04/2020 Final Reclamation Initiated
WB 8-15BP Pipeline 42.557351/-109.695158 0.43 0.43 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/05/2022 06/25/2018 07/05/2022 Final Reclamation Initiated
WB 8-14P Pipeline 42.570609/-109.679226 1.14 1.14 09/12/2008 Sagebrush-dominated w/ Sandy Soils 04/10/2017 07/05/2022 06/21/2018 07/05/2022 Final Reclamation Initiated
WB 8-11P Pipeline 42.584904/-109.677801 2.67 2.67 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022 06/19/2018 07/04/2022 Final Reclamation Initiated
WB 8-10P Pipeline 42.589224/-109.703660 3.02 3.02 07/16/2018 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/04/2022 06/15/2017 08/01/2022 Final Reclamation Initiated